10. WIRING EXAMPLE

10-1 HOW TO CONNECT WIRINGS

Wire only after removing the control box lid as shown in

Fig. 17, refering to view A.

CAUTION

Be sure to attach power supply wiring and earth wire to the

control box with the clamp.

When doing the wiring, make sure the wiring is neat and

does not cause the control box lid to stick up, then close the

cover firmly. When attaching the control box lid, make sure

you do not pinch any wires.

Outside the air conditioners, separate the weak wiring
(remote controller and transmission wiring) and strong wiring 
(earth wire and power supply wiring) by at least 50 mm so
that they do not pass through the same place together. Prox-
imity may cause electrical interference, malfunctions, and
breakage.

A main switch or other means for disconnection, having a

contact separation in all poles, must be incorporated in the

fixed wiring in accordance with relevant local and national

legislation.

Note that the operation will restart automatically if the main

power supply is turned off and then turned back on again.

[ PRECAUTIONS ] 

Refer to the “REMOTE CONTROLLER INSTALLATION

MANUAL” on how to install and lay the wiring for the remote

controller.

See also the “Wiring Diagram plate” attached to the control

box lid when laying electrical wiring.

Connect the remote controller and transmission wiring to

their respective terminal blocks.

CAUTION

• Do not, under any circumstances, connect the power sup-

ply wiring to the remote controller or transmission wiring

terminal block. Doing so can destroy the entire system.

[ Connecting electrical wiring, remote controller wiring, 
and transmission wiring ] (Refer to Fig. 18)

• Power supply and Earth wiring

Remove the control box lid.

Next, pull the wires into the unit through the Wiring through

hole and connect to the terminal block (3P).

Be sure to put the part of the sheathed vinyl into the control

box.

(Rear)

Wiring Diagram

Control box lid

Power supply wiring
Earth wire

Penetration area

• Make sure to let a wire go through a wire penetration area.
• After wiring, seal the wire and wire penetration area to prevent 

moisture and small creatures from the outside.

• Wrap the strong and weak electric lines with the sealing 

material (12) as shown in the figure below.

(Otherwise, moisture or small creatures such as insects from 

the outside may cause short-circuit inside the control box.) 
Attach securely so that there are no gaps.

Sealing 
material (12)

(accessory)

Wire

[How to adhere to it]

Outside 
unit

Inside 
unit

Fig. 17

view A

Power supply wiring
Earth wire

Indoor PCboard 

(ASSY)

Clamps
(for preventing slippage)

*Transmission wiring
*Remote controller wiring

* Do not connect power 

supply wiring here.
That may cause 
malfunction

Control box

Control box

Power supply wiring/Earth wire

Fig. 18

Remote controller wiring
Transmission wiring

Power supply wiring
Earth wire

Wiring through hole

Wiring through hole

Terminal block (6P)

Terminal block (3P)

Indoor PCboard (ASSY)

Clamps

P1 P2 F1 F2 T1 T2

TRANSMISSION

    WIRING

FORCED
  OFF

REMOTE
 CNTRL

4PEN365593-1C.book  Page 10  Thursday, April 20, 2017  1:00 PM

Summary of Contents for FXDQ15P3VE

Page 1: ...INSTALLATION MANUAL FXDQ15P3VE FXDQ20P3VE FXDQ25P3VE FXDQ32P3VE FXDQ40P3VE FXDQ50P3VE FXDQ63P3VE System Inverter Air Conditioners 4PEN365593 1C book Page 1 Thursday April 20 2017 1 00 PM...

Page 2: ...por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acor...

Page 3: ...do so during installation work may result in the unit falling and causing accidents Make sure that a separate power supply circuit is provided for this unit and that all electrical work is carried ou...

Page 4: ...unavoid able use a sling of soft material or protective plates together with a rope when lifting to avoid damage or scratches to the unit When moving the unit at or after opening hold the unit by the...

Page 5: ...allation Check whether the ceiling is strong enough to support the weight of the unit or not If there is a risk reinforce the ceiling before installing the unit To avoid contact with the fan one of th...

Page 6: ...prevent shaking Consult an architect or carpenter for details 4 Install the suspension bolts Use W3 8 to M10 suspension bolts Use a hole in anchor for existing ceilings and a sunken insert sunken anc...

Page 7: ...ion may form on the surface of the insulation if the temperature above the ceiling reaches 30 C or the humidity RH80 CAUTION Follow the points below Use a pipe cutter and flare suitable for the type o...

Page 8: ...phosphor copper brazer BCuP 2 JIS Z 3264 B Cu93P 710 795 ISO 3677 which does not require flux Using a flux containing chlorine may cause the piping to corrode Using a welding flux containing fluorine...

Page 9: ...fer to Fig 13 PRECAUTIONS Drain piping connections Do not connect the drain piping directly to sewage pipes that smell of ammonia The ammonia in the sewage might enter the indoor unit through the drai...

Page 10: ...tion area with aluminum tape or something similar to prevent air escaping CAUTION When attaching a duct to the intake side be sure to attach an air filter inside the air passage on the intake side Use...

Page 11: ...s Do not turn on the power supply circuit breaker or earth leak age breaker until all other work is done 9 2 SPECIFICATIONS FOR FIELD SUPPLIED FUSES AND WIRE Power related NOTES 1 Shows only in case o...

Page 12: ...power sup ply wiring to the remote controller or transmission wiring terminal block Doing so can destroy the entire system Connecting electrical wiring remote controller wiring and transmission wiring...

Page 13: ...For group control or use with 2 remote controllers Terminal block Tightening torque N m Remote controller transmission wiring terminal block 6P 0 79 0 97 Power supply wiring terminal block 3P 1 18 1...

Page 14: ...or remote controller to achieve remote control See the 11 FIELD SETTING AND TEST RUN for details on operation 10 4 CENTRALIZED CONTROL For centralized control it is necessary to designate the group No...

Page 15: ...tion man ual included with the wireless remote controller for details on how to make the settings 3 Perform a test run according to the outdoor unit s installation manual The operation lamp of the rem...

Page 16: ...GHT EMITTINGDIODE S NPL PRESSURESENSOR LOW HAP LIGHT EMITTINGDIODE SERVICEMONITOR GREEN S PH HPS PRESSURESWITCH HIGH HIGH VOLTAGE HIGH VOLTAGE S PL PRESSURESWITCH LOW IES INTELLIGENT EYESENSOR S T THE...

Page 17: ...4P365593 1C 2017 03 Copyright 2013 Daikin 4PEN365593 1C book Page 1 Thursday April 20 2017 1 00 PM...

Reviews: