background image

8

English

1.

Remove the control box lid.  Connect the remote controller
and power supply (single-phase, 50 Hz 220-240 V or sin-
gle-phase, 60Hz 220V) respectively to the terminal block
and securely connect the earth also (as shown in the figure
below).

CAUTION

Securely clamp the cables with the clamps (9)(10) offered 

as accessories as shown in Fig. 17 so that tension will not 

be applied on the cable connection areas.

2.

Confirm that the control box lid is closed before turning on
the power.

3.

Remove the inspection lid.

4.

Gradually pour approximately 1L of water from the inspec-
tion window into the drain pan to check drainage.

CAUTION

Be sure to prevent an external force from being exerted on 

the float switch. 

(This may cause breakage.)

5.

Attach the inspection lid.

6.

Perform the following operation using the remote controller,
and check drainage.

Select the inspection/test operation button “

” using

the remote controller.  The unit will engage the test oper-
ation. Press the operation selector button “

”, and

select FAN OPERATION “

”.

Press the ON/OFF button “

”.  (The indoor fan and

drain pump will operate.)

CAUTION

The fan will turn also at the same time.  Take due care.

Do not touch the drain pump to prevent electric shock.

7.

Make sure to use the remote controller in finishing the oper-
ation.

8. INSTALLING THE DUCT

Connect the duct supplied in the field.

Air inlet side

Attach the duct and intake-side flange (field supply).

Connect the flange to the main unit with accessory screws
(7).

Wrap the intake-side flange and duct connection area with
aluminum tape or something similar to prevent air escaping.

CAUTION

When attaching a duct to the intake side, be sure to attach an air 
filter inside the air passage on the intake side.  (Use an air filter 
whose dust collecting efficiency is at least 50% in a gravimetric 
technique.)
The included filter is not used when the intake duct is attached.

Air outlet side

Connect a duct of appropriate size to the outlet-side flange.

Wrap the outlet-side flange and the duct connection area
with aluminum tape or something similar to prevent air
escaping.

CAUTION

Be sure to insulate the duct to prevent condensation from
forming. (Material: glass wool or polyethylene foam, 25 mm
thick)

Use electric insulation between the duct and the wall when
using metal ducts to pass metal laths of the net or fence
shape or metal plating into wooden buildings.

Be sure to explain about the way of maintaining and cleaning 
additional parts, such as the air filter, grille (both air outlet and 
suction grille), etc. to your customer.

TRANSMISSION

WIRING

REMOTE

CNTRL

T1

F1

FORCED

OFF

P2

F2

P1

T2

N

L

L

N

Power supply: 
Single phase, 
50 Hz, 220 V–
240V
Single phase, 
60Hz, 220 V
Power terminal 
connection 
method

Remote controller 
terminal connection 
method

Terminal block

Terminal block

Indoor PCboard 

(ASSY)

(with rubber cap)

Drain outlet

Service drain hole

Bucket

Refrigerant pipes

Inspection lid

Portable pump

Inspection window

Class

15 · 20 · 25 · 32

40 · 50

63

Number of 

positions

16

22

26

Air outlet side

Air inlet side

Insulation 

material

Main unit

Aluminum tape

Aluminum tape

Flange

Flange

(Field supply)

(Field supply)

(Field supply)

(Field supply)

(accessory)

Connection screw (7)

4PEN365593-1C.book  Page 8  Thursday, April 20, 2017  1:00 PM

Summary of Contents for FXDQ15P3VE

Page 1: ...INSTALLATION MANUAL FXDQ15P3VE FXDQ20P3VE FXDQ25P3VE FXDQ32P3VE FXDQ40P3VE FXDQ50P3VE FXDQ63P3VE System Inverter Air Conditioners 4PEN365593 1C book Page 1 Thursday April 20 2017 1 00 PM...

Page 2: ...por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acor...

Page 3: ...do so during installation work may result in the unit falling and causing accidents Make sure that a separate power supply circuit is provided for this unit and that all electrical work is carried ou...

Page 4: ...unavoid able use a sling of soft material or protective plates together with a rope when lifting to avoid damage or scratches to the unit When moving the unit at or after opening hold the unit by the...

Page 5: ...allation Check whether the ceiling is strong enough to support the weight of the unit or not If there is a risk reinforce the ceiling before installing the unit To avoid contact with the fan one of th...

Page 6: ...prevent shaking Consult an architect or carpenter for details 4 Install the suspension bolts Use W3 8 to M10 suspension bolts Use a hole in anchor for existing ceilings and a sunken insert sunken anc...

Page 7: ...ion may form on the surface of the insulation if the temperature above the ceiling reaches 30 C or the humidity RH80 CAUTION Follow the points below Use a pipe cutter and flare suitable for the type o...

Page 8: ...phosphor copper brazer BCuP 2 JIS Z 3264 B Cu93P 710 795 ISO 3677 which does not require flux Using a flux containing chlorine may cause the piping to corrode Using a welding flux containing fluorine...

Page 9: ...fer to Fig 13 PRECAUTIONS Drain piping connections Do not connect the drain piping directly to sewage pipes that smell of ammonia The ammonia in the sewage might enter the indoor unit through the drai...

Page 10: ...tion area with aluminum tape or something similar to prevent air escaping CAUTION When attaching a duct to the intake side be sure to attach an air filter inside the air passage on the intake side Use...

Page 11: ...s Do not turn on the power supply circuit breaker or earth leak age breaker until all other work is done 9 2 SPECIFICATIONS FOR FIELD SUPPLIED FUSES AND WIRE Power related NOTES 1 Shows only in case o...

Page 12: ...power sup ply wiring to the remote controller or transmission wiring terminal block Doing so can destroy the entire system Connecting electrical wiring remote controller wiring and transmission wiring...

Page 13: ...For group control or use with 2 remote controllers Terminal block Tightening torque N m Remote controller transmission wiring terminal block 6P 0 79 0 97 Power supply wiring terminal block 3P 1 18 1...

Page 14: ...or remote controller to achieve remote control See the 11 FIELD SETTING AND TEST RUN for details on operation 10 4 CENTRALIZED CONTROL For centralized control it is necessary to designate the group No...

Page 15: ...tion man ual included with the wireless remote controller for details on how to make the settings 3 Perform a test run according to the outdoor unit s installation manual The operation lamp of the rem...

Page 16: ...GHT EMITTINGDIODE S NPL PRESSURESENSOR LOW HAP LIGHT EMITTINGDIODE SERVICEMONITOR GREEN S PH HPS PRESSURESWITCH HIGH HIGH VOLTAGE HIGH VOLTAGE S PL PRESSURESWITCH LOW IES INTELLIGENT EYESENSOR S T THE...

Page 17: ...4P365593 1C 2017 03 Copyright 2013 Daikin 4PEN365593 1C book Page 1 Thursday April 20 2017 1 00 PM...

Reviews: