background image

English

13

Trial Operation and Testing

1.

Trial operation and testing.

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temper-

ature.
1) Trial operation may be disabled in either mode depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C in 

heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts, 

such as louver movement, are working properly.

* The air conditioner requires a small amount of power in its standby mode.  If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

* If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2.

Test items. 

Test Items

Symptom

(diagnostic display on RC)

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating 

function

Refrigerant gas and liquid pipes and indoor drain hose extension are ther-

mally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for interconnecting wire connections.

Inoperative or burn damage

Indoor or outdoor unit’s air intake or exhaust has clear path of air.

Stop valves are opened.

Incomplete cooling/heating 

function

Indoor unit properly receives remote control commands.

Inoperative

Thermistor cable is plugged in the connector fully. 

Inoperative

01_EN_3P211822-1C.fm  Page 13  Tuesday, November 27, 2007  6:30 PM

Summary of Contents for FTYN25GXV1B

Page 1: ...Installationsanleitung Split Baureihe R410A Montaj k lavuzlar R410A Split serisi Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instalaci n Serie Split R410A...

Page 2: ...7 08 Nota 09 p 10 Bem rk 11 Information 12 Merk 13 Huom 14 Pozn mka 15 Napomena 16 Megjegyz s 17 Uwaga 18 Nota 19 Opomba 20 M rkus 21 22 Pastaba 23 Piez mes 24 Pozn mka 25 Not 3SB64204 1A FTYN25GXV1B...

Page 3: ...ape the cables so that they do not put undue force on the electrical covers or panels Install covers over the wires Incomplete cover installation may cause terminal overheating electrical shock or fir...

Page 4: ...Installation manual 1 AAA dry cell batteries 2 Drain plug 1 The indoor unit should be sited in a place where the restrictions on installation specified in the indoor unit installation drawings are me...

Page 5: ...more from walls on both sides Service lid Opening service lid Service lid is opening closing type Opening method 1 Remove the service lid screws 2 Pull out the service lid diagonally down in the direc...

Page 6: ...alls facing three sides Side view More than 50 More than 100 Top view More than 50 More than 50 More than 100 More than 150 Top view More than 50 More than 150 More than 300 Construct a large canopy C...

Page 7: ...o prevent possible heat electrical shock or fire Be sure to caulk the gaps around the pipes with caulking material to prevent water leakage 1 Bore a feed through hole of 65mm in the wall so it has a d...

Page 8: ...drain port in place of a drain plug 3 Shape the refrigerant pipe along the pipe path marking on the mounting plate 4 Pass drain hose and refrigerant pipes through the wall hole then set the indoor uni...

Page 9: ...s Do not turn ON the safety breaker until all work is completed 1 Strip wire ends 15mm 2 Match wire colours with terminal numbers on indoor and outdoor units terminal blocks and firmly screw wires to...

Page 10: ...vinyl chloride pipe nominal diameter 13mm directly to the drain hose attached to the indoor unit as with embedded piping work use any commercially available drain socket nominal diameter 13mm as a joi...

Page 11: ...ipes and fittings observe the following 1 Insulation material Polyethylene foam Heat transfer rate 0 041 to 0 052W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C m...

Page 12: ...es from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no...

Page 13: ...nutes close the gas stop valve and stop forced cool ing operation 6 Wiring For interconnecting wire connections see Indoor Unit 4 Wiring Gas stop valve Valve cap Hexagonal wrench Close Liquid stop val...

Page 14: ...the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop 7 Drain work 1 Use drain plug for drainage 2 If the drain port is covered by a mounting base or floor su...

Page 15: ...tandby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off the power...

Page 16: ...0712 HT 3P211822 1C M07B070B Two dimensional bar code is a code for manufacturing...

Reviews: