Purging air and checking gas leakage.

• When piping work is completed, it is necessary to purge the air and check for gas leakage.

 WARNING

1) Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle.
2) When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
3) R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
4) Use a vacuum pump for R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum 

pump or the unit.

• If using additional refrigerant, perform air purging from the refrigerant pipes and 

indoor unit using a vacuum pump, then charge additional refrigerant.

• Use a hexagonal wrench (4mm) to operate the stop valve rod.
• All refrigerant pipe joints should be tightened with a torque wrench at the specified 

tightening torque.

*1. Pipe length vs. vacuum pump run time

*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists.  

Check all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).

1) Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve’s service port.

2) Fully open gauge manifold’s low-pressure valve (Lo) and completely close its high-pressure valve (Hi).  

(High-pressure valve subsequently requires no operation.)

3)  Do vacuum pumping and make sure that the compound pressure gauge reads –0.1MPa (–76cmHg)*1.

4) Close gauge manifold’s low-pressure valve (Lo) and stop vacuum pump.  

(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2.

5) Remove covers from liquid stop valve and gas stop valve.

6) Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal wrench to open valve. 

Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit’s flare and outdoor unit’s flare and valve rods.  
After the check is complete, wipe all soapy water off.

7) Disconnect charging hose from gas stop valve’s service port, then fully open liquid and gas stop valves.

(Do not attempt to turn valve rod beyond its stop.)

8) Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.

Pipe length

Up to 15 metres

More than 15 metres

Run time

Not less than 10 min.

Not less than 15 min.

Compound 
pressure gauge

Pressure 
meter

High-
pressure 
valve

Low-pressure 
valve

Vacuum pump

Service port

Liquid 
stop 
valve

Valve caps

Gas stop valve

Charging 
hoses

Gauge 
manifold

01_EN_3P211822-1C.fm  Page 10  Tuesday, November 27, 2007  6:30 PM

Summary of Contents for FTYN25GXV1B

Page 1: ...Installationsanleitung Split Baureihe R410A Montaj k lavuzlar R410A Split serisi Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instalaci n Serie Split R410A...

Page 2: ...7 08 Nota 09 p 10 Bem rk 11 Information 12 Merk 13 Huom 14 Pozn mka 15 Napomena 16 Megjegyz s 17 Uwaga 18 Nota 19 Opomba 20 M rkus 21 22 Pastaba 23 Piez mes 24 Pozn mka 25 Not 3SB64204 1A FTYN25GXV1B...

Page 3: ...ape the cables so that they do not put undue force on the electrical covers or panels Install covers over the wires Incomplete cover installation may cause terminal overheating electrical shock or fir...

Page 4: ...Installation manual 1 AAA dry cell batteries 2 Drain plug 1 The indoor unit should be sited in a place where the restrictions on installation specified in the indoor unit installation drawings are me...

Page 5: ...more from walls on both sides Service lid Opening service lid Service lid is opening closing type Opening method 1 Remove the service lid screws 2 Pull out the service lid diagonally down in the direc...

Page 6: ...alls facing three sides Side view More than 50 More than 100 Top view More than 50 More than 50 More than 100 More than 150 Top view More than 50 More than 150 More than 300 Construct a large canopy C...

Page 7: ...o prevent possible heat electrical shock or fire Be sure to caulk the gaps around the pipes with caulking material to prevent water leakage 1 Bore a feed through hole of 65mm in the wall so it has a d...

Page 8: ...drain port in place of a drain plug 3 Shape the refrigerant pipe along the pipe path marking on the mounting plate 4 Pass drain hose and refrigerant pipes through the wall hole then set the indoor uni...

Page 9: ...s Do not turn ON the safety breaker until all work is completed 1 Strip wire ends 15mm 2 Match wire colours with terminal numbers on indoor and outdoor units terminal blocks and firmly screw wires to...

Page 10: ...vinyl chloride pipe nominal diameter 13mm directly to the drain hose attached to the indoor unit as with embedded piping work use any commercially available drain socket nominal diameter 13mm as a joi...

Page 11: ...ipes and fittings observe the following 1 Insulation material Polyethylene foam Heat transfer rate 0 041 to 0 052W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C m...

Page 12: ...es from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no...

Page 13: ...nutes close the gas stop valve and stop forced cool ing operation 6 Wiring For interconnecting wire connections see Indoor Unit 4 Wiring Gas stop valve Valve cap Hexagonal wrench Close Liquid stop val...

Page 14: ...the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop 7 Drain work 1 Use drain plug for drainage 2 If the drain port is covered by a mounting base or floor su...

Page 15: ...tandby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off the power...

Page 16: ...0712 HT 3P211822 1C M07B070B Two dimensional bar code is a code for manufacturing...

Reviews: