![background image](http://html1.mh-extra.com/html/daikin/ftxta30aw/ftxta30aw_service-manual_4214030080.webp)
ESIE17-19C
|
Part 3. Repair
3.3. Unit specific repair procedures
Page 80
19/08/19
|
Version 1.1
Optimized Heating 4
Figure 3-15: Removing the switch box
Installation
1. Proceed in reverse order.
1. Insulation
6. Wire clamp
2. Main PCB
7. Screw
3. Electrical power wiring
8. Right side plate assembly
4. Wire terminals
9. Cable tie
5. Screw
10. Switch box
8
3
6
5
7
4
1
10
2
9