background image

2

1

950

890

840

780

 

680

 

840

 

860~910

 

950

4

(160)

3

1

2

3

4

 100 mm

1

3

2

5

4

1

7

6

 100

12

13

8

9

7

6

3

4

5

1

2

1

840

910

840

910

1

2

3

4

5

1

50 - 100

1500

1500

1000

H

1

1

2

*

*

8

3

1

4

6

7

5

2

1500

1500

H

1

1

2

*

*

4

2

5

6

3

860

860 ~ 910*

 20

 20

 35

 35

1

2

3

1

3

2

1

±

10mm

2

5

1

4

3

4

3

11

10

3

5

10

1

8

6

7

11

12

15

4

2

14

7

9

13

Summary of Contents for FHC35B7V1

Page 1: ...onditioners FHC35BZ7V1 FHC45BZ7V1 FHC60BZ7V1 FHYC35BZ7V1 FHYC45BZ7V1 FHYC35B7V1 FHYC45B7V1 FHYC60B7V1 FHYC71B7V1 FHYC100B7V1 FHYC125B7V1 FHYCP35B7V1 FHYCP45B7V1 FHYCP60B7V1 FHYCP71B7V1 FHYCP100B7V1 FH...

Page 2: ...vore instrukser respektive utrustning r utf rd i verensst mmelse med och f ljer f ljande standard er eller andra normgivande dokument under f ruts ttning att anv ndning sker i verensst mmelse med v r...

Page 3: ...100 mm 1 3 2 5 4 1 7 6 100 12 13 8 9 7 6 3 4 5 1 2 1 840 910 840 910 1 2 3 4 5 1 50 100 1500 1500 1000 H 1 1 2 8 3 1 4 6 7 5 2 1500 1500 H 1 1 2 4 2 5 6 3 860 860 910 20 20 35 35 1 2 3 1 3 2 1 10mm 2...

Page 4: ...15 14 17 18 1 2 3 4 7 6 8 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 6 6 1 2 3 4 5 6 S M S S M 2 3 1 20 21 22 SETTING 2 4 3 1 1 2 3 4 7 7 8 1 2 3 4 5 6 8 19 16...

Page 5: ...outdoor units must be designed exclusively for R407C If outdoor units for R22 are connected the system will not work properly Washer for hanging bracket 8 pcs for gas pipe for liquid pipe Insulation...

Page 6: ...lation pitch is marked on the paper pattern for installation Refer to it to check for points requiring reinforcing Space required for installation see figure 2 air flow direc tion 1 Air discharge 2 Ai...

Page 7: ...ion tightly around the hole of the unit as shown The ends of the side plate and the inner insulation must be completely adhered without leaving any clearance along the circumference of the hole Make s...

Page 8: ...tting of liquid line supplied with the unit 4 Insulation for fitting of gas line supplied with the unit 5 Clamps use 2 clamps per insulation If the refrigerant gas leaks during the work ventilate the...

Page 9: ...converging drain pipes 2 After piping work is finished check if drainage flows smoothly Open the water inlet lid add approximately 2l of water gradually and check the drainage flow Method of adding w...

Page 10: ...than 2mm2 1 6 The branch must be sheathed in order to provide an equal or greater degree of insulation as power supply wiring itself 3 Do not connect wires of different gauge to the same grounding te...

Page 11: ...performance filters refer to the option handbook of the high performance filters Setting air filter sign Remote controllers are equipped with liquid crystal air filter signs to display the time to cle...

Page 12: ...RUCTION AND CHECK AFTER INSTALLATION IS FINISHED p 2 After finishing the construction of refrigerant piping drain piping and electric wiring conduct test operation accordingly to protect the unit TEST...

Page 13: ...MITTING DIODE SERVICE MONITOR RED H2P LIGHT EMITTING DIODE SERVICE MONITOR GREEN H3P LIGHT EMITTING DIODE SERVICE MONITOR RED H4P LIGHT EMITTING DIODE SERVICE MONITOR ORANGE SS1 SELECTOR SWITCH MAIN S...

Page 14: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW10740 1...

Reviews: