background image

8

8. Detach the remote controller from the slave unit after the

setting, and reattach to the master unit. This is the end of the
setting procedure.

You do not need to rewire the remote controller from the
master unit if the optional remote controller for slave unit is
used. (However, remove the wires attached to the remote
controller terminal board of the master unit.)

Control by 2 Remote Controllers (Controlling 1 indoor
unit by 2 remote controllers)

When using 2 remote controllers, one must be set to "MAIN"
and the other to "SUB".

MAIN/SUB CHANGEOVER

1. Insert a wedge-head screwdriver into the recess between the

upper and lower part of the remote controller and, working
from the 2 positions, pry off the upper part. (see figure 20)
(The remote controller PC board is attached to the upper part
of the remote controller.)

2. Turn the main/sub changeover switch on one of the two

remote controller PC boards to "S". (see figure 22)
(Leave the switch of the other remote controller set to "M".)

1

Remote controller PC board

2

Factory setting

3

Only one remote controller needs to be changed

NOTE 

For simultaneous operating system, connect the remote
controller cord to the master unit.

INSTALLATION OF THE DECORATION PANEL

Refer to the installation manual attached to the decoration panel.

After installing the decoration panel, ensure that there is no
space between the unit body and decoration panel. Otherwise air
may leak through the gap and cause dew drop.

TEST OPERATION

Refer to the section of “FOR THE FOLLOWING ITEMS, TAKE
SPECIAL CARE DURING CONSTRUCTION AND CHECK
AFTER INSTALLATION IS FINISHED” (p. 2).

After finishing the construction of refrigerant piping, drain
piping, and electric wiring, conduct test operation accordingly
to protect the unit.

TEST OPERATION AFTER INSTALLING DECORATION PANEL

1. Open the gas side stop valve.
2. Open the liquid side stop valve.
3. Electrify crank case heater for 6 hours.
4. Set to cooling operation with the remote controller and start

operation by pushing ON/OFF button.

5. Press Inspection/Test Operation button 4 times (2 times for

wireless remote controller) and operate at Test Operation
mode for 3 minutes.

6. Push air flow direction adjust button to make sure the unit is

in operation.

7. Press Inspection/Test Operation button and operate normally.
8. Confirm function of unit according to the operation manual.

TEST OPERATION BEFORE INSTALLING DECORATION

PANEL (NOTE 3)

1. Open the gas side stop valve.
2. Open the liquid side stop valve.
3. Electrify crank case heater for 6 hours.
4. Set to cooling operation with the wired remote controller and

start operation by pushing ON/OFF button. “A7” appears on
the display.

5. Press Inspection/Test Operation button on the remote

controller and operate at Test Operation mode for 3 minutes.

6. Press Inspection/Test Operation button and operate normally.
7. Confirm function of unit according to the operation manual.
8. Turn off the main power supply after operation.

PRECAUTIONS

1. In case something is wrong with the unit and it does not

operate, refer to the malfunction diagnosis label attached to
the unit.

2. Refer to the installation manual attached to the outdoor unit

in case of Individual Operation System type.

3. Conduct test operation after installing decoration panel if the

wireless remote controller is used.

Summary of Contents for FHC35B7V1

Page 1: ...onditioners FHC35BZ7V1 FHC45BZ7V1 FHC60BZ7V1 FHYC35BZ7V1 FHYC45BZ7V1 FHYC35B7V1 FHYC45B7V1 FHYC60B7V1 FHYC71B7V1 FHYC100B7V1 FHYC125B7V1 FHYCP35B7V1 FHYCP45B7V1 FHYCP60B7V1 FHYCP71B7V1 FHYCP100B7V1 FH...

Page 2: ...vore instrukser respektive utrustning r utf rd i verensst mmelse med och f ljer f ljande standard er eller andra normgivande dokument under f ruts ttning att anv ndning sker i verensst mmelse med v r...

Page 3: ...100 mm 1 3 2 5 4 1 7 6 100 12 13 8 9 7 6 3 4 5 1 2 1 840 910 840 910 1 2 3 4 5 1 50 100 1500 1500 1000 H 1 1 2 8 3 1 4 6 7 5 2 1500 1500 H 1 1 2 4 2 5 6 3 860 860 910 20 20 35 35 1 2 3 1 3 2 1 10mm 2...

Page 4: ...15 14 17 18 1 2 3 4 7 6 8 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 6 6 1 2 3 4 5 6 S M S S M 2 3 1 20 21 22 SETTING 2 4 3 1 1 2 3 4 7 7 8 1 2 3 4 5 6 8 19 16...

Page 5: ...outdoor units must be designed exclusively for R407C If outdoor units for R22 are connected the system will not work properly Washer for hanging bracket 8 pcs for gas pipe for liquid pipe Insulation...

Page 6: ...lation pitch is marked on the paper pattern for installation Refer to it to check for points requiring reinforcing Space required for installation see figure 2 air flow direc tion 1 Air discharge 2 Ai...

Page 7: ...ion tightly around the hole of the unit as shown The ends of the side plate and the inner insulation must be completely adhered without leaving any clearance along the circumference of the hole Make s...

Page 8: ...tting of liquid line supplied with the unit 4 Insulation for fitting of gas line supplied with the unit 5 Clamps use 2 clamps per insulation If the refrigerant gas leaks during the work ventilate the...

Page 9: ...converging drain pipes 2 After piping work is finished check if drainage flows smoothly Open the water inlet lid add approximately 2l of water gradually and check the drainage flow Method of adding w...

Page 10: ...than 2mm2 1 6 The branch must be sheathed in order to provide an equal or greater degree of insulation as power supply wiring itself 3 Do not connect wires of different gauge to the same grounding te...

Page 11: ...performance filters refer to the option handbook of the high performance filters Setting air filter sign Remote controllers are equipped with liquid crystal air filter signs to display the time to cle...

Page 12: ...RUCTION AND CHECK AFTER INSTALLATION IS FINISHED p 2 After finishing the construction of refrigerant piping drain piping and electric wiring conduct test operation accordingly to protect the unit TEST...

Page 13: ...MITTING DIODE SERVICE MONITOR RED H2P LIGHT EMITTING DIODE SERVICE MONITOR GREEN H3P LIGHT EMITTING DIODE SERVICE MONITOR RED H4P LIGHT EMITTING DIODE SERVICE MONITOR ORANGE SS1 SELECTOR SWITCH MAIN S...