Procedure to Clear the Refrigerant Circuit in Case of Frozen Evaporators
ESIE10-01
3–74
3
1
3
4
5
5.2
Procedure to Clean the Refrigerant Circuit in Case of Frozen Evaporators
If water is detected in the refrigerant circuit after an evaporator damage, the following procedure
should be executed to clear the system.
Step
Action
1
Inspection and cleaning of compressor.
Vacuum and heat-up the compressor to remove moisture.
Fill with oil and N
2
.
2
Cleaning & drying refrigerant circuit.
Cleaning components:
■
Expansion valve body.
■
Liquid line solenoid valve.
■
Suction and liquid line.
Replace components:
■
Sight glass
■
Drier filter element by high density filter
■
Compressor oil
Actions:
■
Drill a hole on the bottom of the condenser headers to remove water.
■
Braze the drilled holes.
■
Draw the rags through the suction and liquid line.
■
Blow-
dry
N
2
through all the pipes.
■
Drain compressor oil
■
Vacuum the whole installation:
Check on a regular basis the condition of the oil of the vacuum pump. If the vacuum
oil becomes milky, it should be replaced by new vacuum oil. The crankcase heater
must be activated. It is advisable to connect a second heater tape at the suction of
the compressor.
■
Stop the vacuum and purge with dry nitrogen.
■
Restart the vacuum of the installation; check after a couple of hours the condition of
the vacuum oil. If OK the unit can be recharged.
■
Charge the unit with R-134a.
■
Start the unit & re-commissioning.
■
After 24 hours replace HD filter by new HD filter & replace compressor oil.
■
Check oil contamination with measuring kit.
■
After 48 hours replace HD filter by normal filter drier + check sight glass and
pressures.
3
Find the cause of this evaporator breakdown and take the necessary actions to prevent
recurrence in the future.
Summary of Contents for EWAD620-C17C-SS
Page 2: ......
Page 8: ...ESIE10 01 1 2 Part 1 System Outline 3 1 1 5...
Page 111: ...ESIE10 01 General Outline Part 1 System Outline 1 105 3 1 4 5 1 36 1 Power Compressor 1 2...
Page 112: ...General Outline ESIE10 01 1 106 Part 1 System Outline 3 1 1 4 5 1 36 2 Power Compressor 3...
Page 113: ...ESIE10 01 General Outline Part 1 System Outline 1 107 3 1 4 5 1 36 3 Kit Pumps...
Page 122: ...General Outline ESIE10 01 1 116 Part 1 System Outline 3 1 1 4 5 1 36 12 Digital Inputs Board...
Page 123: ...ESIE10 01 General Outline Part 1 System Outline 1 117 3 1 4 5 1 36 13 Digital Outputs Board...
Page 124: ...General Outline ESIE10 01 1 118 Part 1 System Outline 3 1 1 4 5 1 36 14 Digital Outputs Board...
Page 127: ...ESIE10 01 General Outline Part 1 System Outline 1 121 3 1 4 5 1 36 17 Extension Control Fans 4...
Page 131: ...ESIE10 01 General Outline Part 1 System Outline 1 125 3 1 4 5 1 36 21 EEXV Compressor 1...
Page 134: ...General Outline ESIE10 01 1 128 Part 1 System Outline 3 1 1 4 5 1 36 24 EEXV Compressor 2...
Page 137: ...ESIE10 01 General Outline Part 1 System Outline 1 131 3 1 4 5 1 36 27 EEXV Compressor 3...
Page 138: ...General Outline ESIE10 01 1 132 Part 1 System Outline 3 1 1 4 5 1 36 28 Pumps Control...
Page 139: ...ESIE10 01 General Outline Part 1 System Outline 1 133 3 1 4 5 1 36 29 Terminals M1 M2...
Page 140: ...General Outline ESIE10 01 1 134 Part 1 System Outline 3 1 1 4 5 1 36 30 Terminals M3...
Page 141: ...ESIE10 01 General Outline Part 1 System Outline 1 135 3 1 4 5 1 36 31 Terminals M5 MQ...
Page 148: ...General Outline ESIE10 01 1 142 Part 1 System Outline 3 1 1 4 5...
Page 150: ...ESIE10 01 2 2 Part 2 Functional Description 3 1 2 5...
Page 170: ...The Digital Controller ESIE10 01 2 22 Part 2 Functional Description 3 1 2 4 5...
Page 200: ...Functional Control ESIE10 01 2 52 Part 2 Functional Description 3 1 2 4 5...
Page 202: ...ESIE10 01 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 254: ...Alarms and Events ESIE10 01 3 54 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...Controller Inputs and Outputs ESIE10 01 3 66 Part 3 Troubleshooting 3 1 3 4 5...
Page 280: ...ESIE10 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 286: ...Pre Test Run Checks ESIE10 01 4 8 Part 4 Commissioning and Test Run 3 1 4 5...
Page 289: ...ESIE10 01 Running Data Part 4 Commissioning and Test Run 4 11 3 4 5 1...
Page 290: ...Running Data ESIE10 01 4 12 Part 4 Commissioning and Test Run 3 1 4 5...