ESIE11-02
Malfunction Indications and Safeties Overview
3–11
3
3
4
5
1
2.3
Safeties Overview: EUWA*5-24KBZW1 and EUWY*5-24KBZW1
Safety devices
The table below contains an overview of the safety devices.
(1)
: An overview of the fuses and overcurrent relays is given in "Checking the Power Supply and Fuses:
EUWA*5-24KBZW1 and EUWY*5-24KBZW1" on page 3–18.
Alarm
description
Alarm
indication
Activation
Reset
Wiring code
Device
Flow switch or
pump contact
fl
No flow for 5 s or no sufficient flow
during a period of 15 s after pump
start.
Manual software
reset
S10L, S11L
Contact closed
on flow
Reverse phase
protector
fl
+
hp1
Wrong
phase
sequence
(only if the unit is ON)
Correct phase
sequence
A2P
I/O PCB
High-pressure
switch
hp1
Discharge
pressure
> 30.9 bar
Manual software
reset
S1PH, S2PH
Switch ON/OFF
Low-pressure
switch
lp1
Low-pressure
ON
■
Standard: 1.2 bar
■
ZL/ZH: 0.5 bar
Manual software
reset
S4LP, S5LP
Switch ON/OFF
Outlet water
temp. too low
(freeze-up
protection)
a1
Outlet
water
temp.
■
temp. < 4.0°C
■
temp. < -11.5 °C
■
temp. < -6.5 °C
Standard
ZL option
ZH option
Manual software
reset
R4T
NTC sensor
Discharge ther-
mal protector
hp1
High compressor discharge temp.
> 135°C
Manual software
reset and temp.
< 115°C
Q1D, Q2D
Bimetal
ON/OFF
Overcurrent
relay compres-
sor motor
hp1
Overcurrent
(1)
Manual software
reset
K4S, K5S
Bimetal
ON/OFF
NTC probe
ambient temper-
ature
hp1
Probe is defective
Manual software
reset
R6T
NTC sensor
NTC probe
evaporator inlet
e1
Probe is defective
Automatic reset
R3T
NTC sensor
NTC probe of
the outlet water
temperature
e2
Probe is defective
Automatic reset
R4T
NTC sensor
■
Fuse
evaporator
heater tape
(F4)
■
Reverse
phase
■
Problem I/O
PCB
e3
■
Fuse blown
■
Reverse or no power supply
■
I/O PCB malfunction
Automatic reset
F4
■
fuse
■
I/O PCB
Communication
error remote
terminal
OFFLINE
Communication error between the
digital controller and the remote
terminal
Automatic reset
■
Cable
■
Parameter
h23
■
Controller
■
Address
card
■
RJ12 power
supply
Summary of Contents for EUWY 24KBZW1 Series
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...