Functional Description
ESIE11-02
2–20
Part 2 – Functional Description
3
1
2
4
5
Starting defrost
function
The table below describes the start conditions for the defrost function.
Terminating defrost
function
The table below describes the terminating conditions for the defrost function.
Start condition 1
T
coil
C1/2 < 0.6 x T
amb
-10°C
AND
T
coil
C1/2 < -10°C
AND
T
amb
< 50°C
TimConditional
Depending on
dipswitch S2A-1
in combination
with EUWY
setting
(S1A-234)
Start condition 2
Start condition 2A:
T
coil
C1/2 < 0.6 x T
amb
-10°C
AND
T
coil
C1/2 < -10°C
AND
T
amb
< 50°C
TimConditional
OR
Start condition 2B:
T
coil
C1/2 < 0.6 x T
amb
-1°C
AND
T
coil
C1/2 < -1°C
AND
T
amb
< 50°C
TimConditional
AND
TimCompMin
Stop condition 1
{ (T
amb
at defrost start time
≥
B°C) AND (T
coil
C1/2 > +20°C) }
OR
{ (T
amb
at defrost start time < B°C) AND (T
coil
C1/2 > +10°C) }
B = 5°C
Stop condition 2
After Timdefrost Max:
The defrost operation can take maximum 10 minutes. After the 10
minutes defrost operation, the unit returns to the heating mode.
Stop condition 3
If for some reason the high pressure increases above the control
setpoint of the high pressure switch (S21HP/S22HP), the unit will
stop the defrost operation and return to the heating mode.
Summary of Contents for EUWY 24KBZW1 Series
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...