7
|
Unit installation
Installer reference guide
80
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
7.3.6 To install the discharge grille
INFORMATION
Electrical wiring.
Before installing the discharge grille, connect the electrical wiring.
Install the lower part of the discharge grille
1
Insert the hooks.
2
Insert the ball studs.
1
2
3
Fix the 2 lower screws.
3
2×
5 N•m
Install the upper part of the discharge grille
NOTICE
Vibrations.
Make sure the upper part of the discharge grille is attached seamlessly to
the lower part to prevent vibrations.
4
Align and attach the left side.
5
Align and attach the middle part.
6
Align and attach the right side.