8
|
Piping installation
Installer reference guide
93
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
1
2
6
Cut open the top cover.
If the space heating/cooling or the domestic hot water pipes are directed upwards,
the top cover must be cut along the perforation with a suitable tool.
7
Support the water piping.
For rearward facing connections: Support hydraulic lines suitably according to the
spatial conditions. This is valid for all water pipes.