- 19 -
AHU Commissioning Check Sheet
General Information
Project
:
Unit Name
:
Unit Model
:
Unit Serial Number
:
Installation Date
:
Commissioning Date
:
Initial Checking (Pre-start Up)
A)
Fan Section
1.
Are all fasteners tightened?
Answer:
Yes
No
2.
Motor winding Resistances.
U1-U2: __________
V1-V2: __________
W1-W2: __________
3.
Motor Megger Test.
U-Ground: __________ V-Ground: __________ W-Ground: _________
4.
Are all electrical connections tight and of correct wiring?
Answer:
Yes
No
5.
Correct incoming voltage that supplied to motor
L1-L2: __________
L2-L3: __________
L3-L1: __________
6.
Rotate fan wheel whether it can rotate freely and without abnormal noise.
Answer:
Yes
No
7.
Are pulleys aligned?
Answer:
Yes
No
8.
Is belt tensioning correct?
Answer:
Yes
No
Value:_______________
9.
Are lock blower bases (blower base shipment bracket) removed?
Answer:
Yes
No
10.
Are spring isolators adjusted to be same height?
Answer:
Yes
No
11.
Ensure no construction debris or foreign material left inside AHU.
Answer:
Yes
No
12.
Correct duct turning elbow direction and sufficient effective duct length.
Answer:
Yes
No
*Please attach duct layout from reference.