6.1.3 Fan Array 

 

Fan  array  is  available  for  EC  plug  fan. 

Ensure  all  fans  are  control  to  run 
simultaneously and with same speed. 
Fans running at unequal speeds can result 

uneven  airflow  that  cause  performance, 
sound,  vibration  problems  that  lead  to 

failure.  
In case one of the fan is down, blank off 
plate shall be temporarily  installed  on the 

nonfunctional  fan  to  prevent  air  re-
circulation  while  waiting  fan  replacement 

(See  Figure  33).  If  present  of  differential 
pressure  controller,  ensure  the  pressure 

tube  of  nonfunctional  fan  is  capped  and 
amend the setting of controller accordingly. 

 

Figure 33 - Fan Array with Blank-off Plate 

 

6.1.4 Vibration Isolator Mount 

 

Ensure  the  vibration  isolator  mounts  and 

flexible  connections  allow  the  fan  and 
motor to move freely without constrain. 
For the fan with Restrained Spring Isolator, 

ensure  that  the  Alu  Angle  plates  are 
removed  from  the  restrained  spring 

isolator before commissioning. 

 

IMPORTANT 

The  clearance  between  flanges 

of “Top plate” and “Base plate” 

for  restrained  spring  isolator 

should  be  approximately  10-

20mm.

 

 

6.1.5 Coils 

 

Check  the  pipe-work  to  coil  is  correctly 
connected  and  the  fins  are  free  from 

foreign matter or damage. 
Check that the condensate drain is trap. 

Ensure good  sealing  of silicon  around  the 
coil headers and drain pipe. 

 
6.1.6 Damper & Filters 

 

Check all dampers  are operating  correctly 
as per design. 
Make  sure  all  filter  media  are  installed  in 

correct airflow direction. 
 

6.1.7 Panel & Section 

 

Ensure  all  access  panels  are  in  position 
and  secure.  Make  sure  all  necessary 

section joints are in place. 
 
6.1.8 Electric Heater 

 

Electric  Heater  –

  Before  starting-up, 

ensure  that  the  air  flow  through  the 
heater should not be lower than 2.0  m/s 

to avoid overheating heater. 

 

WARNING 

FOR 

380-415V/3PH, 

STAR 

CONNECTION  WITHOUT NEUTRAL 

(

Figure  34

),  UNBALANCED  PHASE 

VOLTAGE  MAY  CAUSE  DAMAGE 

ON THE ELECTRIC HEATER. 

 

 

Figure 34 - Wiring Diagram without Neutral

 

 

FOR 

380-415V/3PH, 

STAR 

CONNECTION 

WITH 

NEUTRAL 

(

Figure  35

),  NEUTRAL  POINT  MUST 

BE CONNECTED IN ACCORDANCE 

WITH  WIRING  DIARGRAM  IN 

ORDER TO CARRY CURRENT DUE 

TO 

UNBALANCED 

PHASE 

VOLTAGE. 

 

IMPORTANT 

SAFETY  THERMOSTAT  IS  FOR 

OVERHEATING 

PROTECTION 

ONLY, 

NOT 

FOR 

CONTROL 

PURPOSE.  DEFAULT  SETPOINT  IS 

60˚C.  

IT  MUST  BE  CONNECTED  TO 

CONTACTOR 

(WHETHER 

SUPPLIED  BY  FACTORY  OR  SITE) 

TO  CUT-OFF  HEATER  IN  CASE  OF 

OVERHEATING HEATER. 

Summary of Contents for DM AHU

Page 1: ...LATION OPERATION MAINTENANCE VER O AHU01 DEC20 15 The design and construction are subject to change without any notice for future improvement MODELS DM AHU DS AHU AHUR VRV AHU Double Skin Modular Air...

Page 2: ...rtificate which is determined by International National or Local Codes and Regulation Place of service should be equipped with the necessary protective equipment which provide safe maintenance 1 4 Uni...

Page 3: ...truck 4 Storage For external storage prior to installation the units must be protected from dust rain constant sun exposure and rodents Although covered in shrink wrapped plastic sheeting this is not...

Page 4: ...carefully assembled to desired unit arrangement The air handling units are design to use section joint brackets to combine two sections Section joints for cabinet and base frame are shown in Figure 5...

Page 5: ...on joint WARNING CABINET SECTION JOINTS ARE NOT INTENDED FOR LIFTING PURPOSE AND PULLING CABINET FROM A DISTANCE TO JOIN SECTION TOGETHER When the cabinets are penta post to penta post arrangement or...

Page 6: ...hipped out from factory See Figure 15 Figure 14 Restrained Spring Isolator Figure 15 Removing of U Shaped Plate 5 5 Arrangement VRV AHU Control box and expansion valve kit are installed on the air han...

Page 7: ...joints or flexible fittings are to be provided in all piping connections particularly those adjacent to heating source to absorb expansion and contraction strains Failure to comply will result in dama...

Page 8: ...valve and not to a common header When two or more coils are connected to a common suction line never place the bulb on the common line Thermostatic expansion valve is to be equipped with external equa...

Page 9: ...r control refer to the VFD manual for wire size and requirements Figure 22 3 phases motor connection diagram 5 7 2 Motor Cabling Motor wiring must go downward from motor terminal box to prevent conden...

Page 10: ...he diameter of smaller pulley Table 2 Adjusted Pitch Diameter Model VPT100Z1 VPT120A1 A2 VPT139A1 A2 VPT156A1 A2 VPT177A1 A2 VPT178B2 Max Pitch mm 96 114 4 133 4 150 4 171 4 171 Min Pitch mm 82 9 96 1...

Page 11: ...ee Table 2 Figure 27 When the required diameter is obtained adjustable flange is locked by tighten the four clamp screws To get the same diameter in the two grooves of pulleys screw the two mobile fla...

Page 12: ...out Notes 1 Elbows should not be closer than 2 1 2 times the Duct Equivalent Diameter Refer to Formula 1 2 Dampers should be placed at least fan diameters downstream of the fan discharge Formula 1 Duc...

Page 13: ...ther For DX coils it is advisable that the refrigerant is to be pumped into the condenser If this is not possible refrigerant shall be purged out WARNING DO NOT HEAT ANY PART ON DX COIL IF REFRIGERANT...

Page 14: ...20mm 6 1 5 Coils Check the pipe work to coil is correctly connected and the fins are free from foreign matter or damage Check that the condensate drain is trap Ensure good sealing of silicon around th...

Page 15: ...or cap screw are in secure position CAUTION HIGH AIR TEMPERATURE IN FAN SECTION CAN CAUSE MOTOR OVERHEAT AND DAMAGE ON DRAW THROUGH AIR HANDLERS ADJUST THE DISCHARGE AIR TEMPERATURE OF THE HEATING SE...

Page 16: ...ling heating efficiency Dry cleaning is done by using a powerful vacuum cleaner on the dust accumulated side If coil is very dirty coils need to be removed for wet cleaning by trained personnel Ensure...

Page 17: ...IR VELOCITY SHOULD NOT BE LOWER THAN 2 0 m s 7 7 Heat Wheel Heat Pipe The unit should be maintained in line with the manufacturer recommendation Please refer installation and maintenance manual for de...

Page 18: ...not evenly supported on foundation j Fan assembly s tolerance is out of range a Consult manufacturer b Remove transport bracket c Check pulley alignment d Re tension belts e Replace vibration isolato...

Page 19: ...he heat wheel baffle top 8 Assembled back the remaining panels 9 2 AHU Water Quality Water quality requirements Water softening treatment must be given in advance to prevent scaling in the heat exchan...

Page 20: ...Yes No 5 Correct incoming voltage that supplied to motor L1 L2 __________ L2 L3 __________ L3 L1 __________ 6 Rotate fan wheel whether it can rotate freely and without abnormal noise Answer Yes No 7 A...

Page 21: ...Are the AHU sections joined with section joint properly Answer Yes No 4 Are the joining between AHU sections sealed properly Answer Yes No Start Up Checking 1 Is fan rotated in correct direction Answe...