WIRING TRANSFORMER AND PCB

IMPORTANT: 

When wiring PCB power supply to PCB trans-

former, an insulated bushing (field supplied) must be installed in
the furnace cabinet wall.  Wiring must pass through bushing to
interior of cabinet. 

DO NOT ALLOW WIRING TO PASS ALONG

AREAS WHERE WIRING IS EXPOSED TO ABRASIVE METAL
EDGES. DO NOT ALTER BLOWER DECK.

To power PCB transformer: Use high voltage red and  black
wires provided in transformer kit.  Route red/black transformer
power supply to PCB transformer from field wiring.

 DO NOT

POWER BOARD WITH FACTORY INSTALLED FURNACE
R/C THERMOSTAT POWER.

Create  wire  trap  on  outside of cabinet wall before passing
into cabinet. The wire  trap must remain below the insulated
wire bushing location to prevent moisture intrusion into fur-
nace cabinet and onto electrical components.

Outside the cased coil, do not route the remote controller
wiring and transmission wiring together with other electrical
wiring.  Keep the remote controller wiring and transmission
wiring at least 2 in. (50mm) away from the power wiring and
other electrical wiring. Effects of electrical interference (ex-
ternal noise) may result in malfunction and breakdown.

Use only specified wire and connect to terminals tightly. Be
careful that wires do not place external stress on terminals.
Keep wire in neat order; not to obstruct other equipment.
Make sure that the control panel cover is closed tightly. In-
complete connections could result in overheating, and in
worse cases, electric shock or fire.

Never connect power supply wiring to the terminal block for
remote controller wiring as this could damage the entire sys-
tem.

When doing the wiring, make sure the wiring is neat and
does not cause the control panel to stick up, and then close
the cover firmly. When attaching the control cover, make
sure you do not pinch any wires.

PRECAUTIONS

Refer to the “REMOTE CONTROLLER INSTALLATION
MANUAL” on how to install and lay the wiring for the remote
controller.

See also the “Wiring Diagram Label” located on the under-
side of the control panel cover.

Connect the remote controller and transmission wiring to their
respective terminal blocks.

WIRING EXAMPLE

Furnace

Most

Downstream

Indoor unit

Indoor unit B

Indoor unit A

(CXTQ)

Power supply
single phase
60Hz 208/230V

Power supply
single phase
60Hz 208/230V

Remote

Controller

(Option)

Remote

Controller

(Option)

Remote

Controller

(Option)

Gas Furnace

NO. 1 SYSTEM:

When using 1 remote controller for 1 indoor unit.

Figure 17

Summary of Contents for CXTQ24TASBLUA

Page 1: ...LUA CXTQ60TASBLUA INSTALLATION MANUAL ONLY PERSONNEL THAT HAVE BEEN TRAINED TO INSTALL ADJUST SERVICE OR REPAIR HEREINAFTER SERVICE THE EQUIPMENT SPECIFIED IN THIS MANUAL SHOULD SERVICE THE EQUIPMENT...

Page 2: ...or death by suffocation Nails and other metal or wood parts used for packing may cause wounds or other injuries All phases of the field installation including but not lim ited to electrical piping sa...

Page 3: ...composition can change and the system will not work properly The indoor unit is for R 410A See the catalog for indoor models that can be connected Normal operation is not possible when connected to ot...

Page 4: ...e plates together with a rope when lifting to avoid damage or scratches to the unit Be sure to verify the type of R 410A refrigerant to be used before installing the unit Using an incorrect refrigeran...

Page 5: ...nough to bear the indoor unit weight Where piping between indoor and outdoor units is pos sible within the allowable limit Refer to the installa tion manual for the outdoor unit If a return air duct i...

Page 6: ...6 English UPFLOW Figure 2 DOWN FLOW Figure 3...

Page 7: ...insu lation kit DPICX is recommended Insulation kits are available through your local Daikin distributor The DPICX is not supplied with the cased coil and is recommended to mini mize pan sweating in...

Page 8: ...he designated refrigerant such as air to get mixed into the refrigerant circuit If any refrigerant gas leaks while working on the unit immediately ventilate the room 5 1 Cut off the spin closure This...

Page 9: ...lure Reconnect Control Panel wiring to component wiring 5 5 After the work is finished make sure to check that there is no gas leak Follow the VRV Air Tight test procedure in the outdoor unit installa...

Page 10: ...equired run the line separately from the primary drain and end it where conden sate discharge can be easily seen Drain port labeled A in Figure 10 is the primary drain and con densate drain line must...

Page 11: ...ctwork in an area that can intro duce toxic or objectionable fumes odors into the ductwork The return ductwork is to be connected to the gas furnace 8 ELECTRICAL WIRING WORK IMPORTANT All routing of e...

Page 12: ...quipment s unit nameplate power requirements and within the range shown 24 VAC power volt age is supplied to EEV cased coil control board from transformer supply terminals See Figure 13 For appropriat...

Page 13: ...r to the mounting holes of the furnace transformer on the PCB control deck Bracket B should be located between the PCB control deck and furnace transformer Secure innermost bracket mounting location a...

Page 14: ...e may result in malfunction and breakdown Use only specified wire and connect to terminals tightly Be careful that wires do not place external stress on terminals Keep wire in neat order not to obstru...

Page 15: ...Single phase 24V Outdoor Unit MAIN SUB NO 2 SYSTEM For group control or use with 2 remote controllers Figure 18 When one remote controller is used with multiple indoor units which are different model...

Page 16: ...ecification Gauge Length External terminal Contact that can ensure the minimum applicable load of 16 V DC 1mA Table 4 In the case of Forced Off and On Off operation The user can use this function for...

Page 17: ...GS WHEN USING THE OPTIONAL REMOTE SENSOR This product does not include an air inlet thermistor It uses the remote controller thermistor to measure the room temperature For this reason it is necessary...

Page 18: ...30 min 45 min 07 09 11 Run gas furnace during defrost oil return operation Allowed Allowed Allowed Heat pump prohibition duration 15 min 30 min 45 min Factory set This time means the duration which CX...

Page 19: ...T CODE NO SECOND CODE NO LL 01 User set fan speed 02 OFF 03 Factory set 12 22 3 Table 14 NOTE a When fan operation is allowed during heating thermo off careful consideration is required before decidin...

Page 20: ...OFF ON OFF OFF OFF ON OFF ON ON OFF OFF OFF ON ON OFF ON OFF ON ON ON ON ON DS2 OFF OFF OFF OFF OFF ON ON OFF OFF ON OFF ON OFF ON OFF OFF ON ON ON ON OFF ON ON ON OFF OFF ON OFF OFF ON ON ON Factory...

Page 21: ...rnace s fan operation when the UV lamp or humidifier is operating Refer to Table 18 Terminal Name Input output signal CONTROL ON OFF Outputs indoor unit ON Wet contact 24V 11 5VA or less ECONOMIZER 2...

Page 22: ...refrigerant charge mode etc the gas furnace test will not start c This setting will be returned to factory setting automatically after finishing test operation GAS FURNACE TEST MODE MODE NO FIRST CODE...

Page 23: ...23 English THIS PAGE INTENTIONALLY LEFT BLANK...

Page 24: ...24 English Our continuing commitment to quality products may mean a change in specifications without notice 2017 5151 San Felipe St Suite 500 Houston TX 77056 www daikincomfort com...

Reviews: