![background image](http://html1.mh-extra.com/html/daikin/ccxs09pvm/ccxs09pvm_service-manual-removal-procedure_2460457016.webp)
Electrical Box
Si091659E
14
Removal Procedure
6. Electrical Box
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the electrical
box.
[H1]: power supply, black
[H2]: power supply, white
[H3]: transmission, red
1
2
Remove the screw, and
then the wire fixture.
Remove the screws of
the power supply wire
and connecting wire on
the terminal board.
3
Disconnect the
connectors [S200]
[S40] [S52].
[S40] : float switch of drain
pump
[S52] : drain pump unit
[S200]: DC fan motor
4
Disconnect the relay
connector for the heat
exchanger thermistor.
Wire fixture
Terminal board
(R23767)
[S200] [S40]
[S52]
(R10940)
Relay connector
for heat exchanger
thermistor
(
R10941
)