![background image](http://html1.mh-extra.com/html/daikin/ccxs09pvm/ccxs09pvm_service-manual-removal-procedure_2460457012.webp)
Air Outlet ASSY
Si091659E
10
Removal Procedure
2. Remove the swing motor
for the horizontal blades.
1
Remove the 2 screws,
and then the horizontal
swing motor fixture.
2
Remove the 3 screws,
and then remove the
swing motors.
3. Remove the swing motor
for the vertical blades.
1
Remove the screw, and
then the motor cover for
the vertical blades.
2
Release the link (1)
from the swing motor
with a flat screwdriver.
Step
Procedure
Points
Horizontal swing motor fixture
(R23759)
Swing
motor
(R23760)
Motor cover
(R10923)
Swing motor
Link (1)
(R10924)