D-EIMWC00908-16EN - 37/52
Prestart System Checklist
Chilled Water
Piping complete....................................................................................... ………………………….
Water system filled, vented...................................................................... …………………………
Pumps installed, (rotation checked), strainers cleaned............................. …………………………
Controls (3-way, face and bypass dampers, bypass valves, etc.) operable ………………………..
Strainer installed at evaporator inlet........................................................ ………………………….
Water system operated and flow balanced to meet unit design requirements ……………………..
Condenser Water
Cooling tower flushed, filled and vented ..........................................................................................
Pumps installed, (rotation checked), strainers cleaned .....................................................................
Strainer installed at condemser inlet..................................................................................................
Controls (3-way, bypass valves, etc.) operable .................................................................................
Water system operated and flow-balanced to meet unit requirements ..............................................
Electrical
Power leads connected to the unit power panel(s) ..............................................................................
All interlock wiring complete between control panel and complies with specifications ……………
Pump starters and interlock wired .......................................................................................................
Cooling tower fans and controls wired ................................................................................................
Wiring complies with local codes ........................................................
Condenser pump starting relay (CWR) installed and wired ................................................................
Miscellaneous
Relief valve piping complete ...............................................................................................................
Thermometer wells, thermometers, gauges, control wells, controls, etc., installed …………………
Minimum system load of 80% of machine capacity available for testing and adjusting controls ......
Control wiring between multiple units, if applicable...........................................................................
Note
:
This checklist must be completed and sent to the local Factory Service location two weeks prior to start-up
.
Summary of Contents for C10FZXS
Page 16: ...D EIMWC00908 16EN 16 52 Figure 4 Evaporator pressure drop...
Page 17: ...D EIMWC00908 16EN 17 52...
Page 18: ...D EIMWC00908 16EN 18 52 Figure 5 Condenser pressure drop...
Page 34: ...D EIMWC00908 16EN 34 52 Figure 12 Compressor overview...
Page 50: ...D EIMWC00908 16EN 50 52...
Page 51: ...D EIMWC00908 16EN 51 52...