![background image](http://html1.mh-extra.com/html/daikin/bsvq36pvju/bsvq36pvju_installation-manual_2460455008.webp)
7
English
5. BS UNIT INSTALLATION
Use only accessories and parts which are of the designated specification when installing.
(1)
When necessary, use the following procedure to change the Electrical Components Box mounting surface.
(
Refer to Fig. 4
)
1) Remove the Electrical Components Box lid. (2 screws)
2) Remove the Electrical Components Box. (2 screws)
3) Remove the top panel. (4 screws)
4) Remove the coil cover. (1 screw)
5) Change the pull out direction of the wire (motorized valve coil) between the body and the Electrical Compo-
nents Box.
6) Rotate the coil cover 180° and attach it.
7) Turn the top panel around 180° and attach it.
8) Attach the Electrical Components Box.
9) Attach the Electrical Components Box lid.
(2)
Attach the hooks to the suspension bolts.
Be sure to use the nuts (M8 or M10: 3 pcs, 4 locations) and washers
(field supply) from both the top and bottom sides of the hanging
bracket and make sure they are tightened correctly.
NOTES
•
The BS unit has a top and a bottom, so install it so that the diagonal lines in the figure 4 are where the top is.
(Failing to do so may prevent the unit from operating properly and increase the volume of the operating noise.)
Washer
(Field supply)
Nut
(Field supply)
BS unit
proper
Hanging
bracket
3/8 – 9/16 in.
Nut
(Double nut)
(Field supply)
Suspension bolt
(Field supply)
Electrical Components
Box lid
Coil cover
Top Panel
Electrical Components
Box
5)-2
(Move the
Electrical Components Box)
1)
1)
2)
4), 6)
3), 7)
3), 7)
3), 7)
3), 7)
(Rotate 180 degrees)
6)
7)
(Rotate 180 degrees)
2)
9)
9)
8)
8)
4)
2)
[Before change 5)-1]
[After change 5)-3]
Electrical Components Box
Electrical Components Box
Remove the wire from the
wire clip.
Pass the wire through the
wire clip.
Fig. 4
Summary of Contents for BSVQ36PVJU
Page 19: ...3P194121 3M EM07A062C 0909 FS...