![background image](http://html.mh-extra.com/html/daikin/atc25qrv16/atc25qrv16_service-manual_501360009.webp)
Si041402EC
Electrical Box
Removal Procedure
7
5. Electrical Box
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1
Remove the screw, and
then the service cover.
2
3
Remove the screw, and
then the wire fixture.
Remove the 4 screws
on the terminal board
and disconnect the
connecting wire.
4
5
Disconnect the 3
connectors.
Release the harnesses
from the hooks.
(a) fan motor:
[S1] or [CN_FAN]
(b) swing motor:
[S6] or [CN_STP]
(c) fan motor (Hall IC):
[S7] or [CN101]
Service cover
(R20065)
Wire fixture
Terminal board
(R20066)
Connecting wire
(a)
(b)
(c)
Hook
Hook
(R23417)