![Daikin Altherma EBLQ014CAV3 Installation Manual Download Page 4](http://html1.mh-extra.com/html/daikin/altherma-eblq014cav3/altherma-eblq014cav3_installation-manual_4041932004.webp)
Table of Contents
Installation manual
4
EBLQ+EDLQ011~W1
Daikin Altherma low temperature monobloc
4P522031-1 – 2018.01
Table of Contents
1 About the documentation
4
1.1
About this document..................................................................
4
2 About the box
4
2.1
Outdoor unit...............................................................................
4
2.1.1
To remove the accessories from the outdoor unit.......
4
3 Preparation
5
3.1
Preparing the installation site ....................................................
5
3.1.1
Installation site requirements of the outdoor unit ........
5
3.2
Preparing water piping ..............................................................
5
3.2.1
To check the water volume and flow rate ...................
5
3.3
Preparing electrical wiring .........................................................
6
3.3.1
Overview of electrical connections for external and
internal actuators ........................................................
6
4 Installation
7
4.1
Opening the units ......................................................................
7
4.1.1
To open the outdoor unit.............................................
7
4.1.2
To open the switch box cover of the outdoor unit .......
7
4.2
Mounting the outdoor unit..........................................................
7
4.2.1
To provide the installation structure ............................
7
4.2.2
To install the outdoor unit............................................
7
4.2.3
To provide drainage ....................................................
7
4.2.4
To prevent the outdoor unit from falling over ..............
8
4.3
Connecting the water piping......................................................
8
4.3.1
To connect the water piping........................................
8
4.3.2
To connect the water piping to the backup heater ......
9
4.3.3
To protect the water circuit against freezing ...............
9
4.3.4
To fill the water circuit ................................................. 10
4.3.5
To insulate the water piping ........................................ 10
4.4
Connecting the electrical wiring.................................................
10
4.4.1
To connect the electrical wiring on the outdoor unit.... 10
4.4.2
To connect the main power supply ............................. 11
4.4.3
To connect the user interface ..................................... 11
4.4.4
To connect the shut-off valve...................................... 12
4.4.5
To connect the domestic hot water pump ................... 12
5 Configuration
13
5.1
Overview: Configuration ............................................................
13
5.1.1
To connect the PC cable to the switch box................. 13
5.1.2
To access the most used commands ......................... 13
5.1.3
To copy the system settings from the first to the
second user interface.................................................. 14
5.1.4
To copy the language set from the first to the second
user interface .............................................................. 15
5.1.5
Quick wizard: Set the system layout after first power
ON............................................................................... 15
5.2
Basic configuration ....................................................................
15
5.2.1
Quick wizard: Language / time and date..................... 15
5.2.2
Quick wizard: Standard............................................... 15
5.2.3
Quick wizard: Options ................................................. 16
5.2.4
Quick wizard: Capacities (energy metering) ............... 17
5.2.5
Space heating/cooling control..................................... 17
5.2.6
Domestic hot water control ......................................... 18
5.2.7
Contact/helpdesk number ........................................... 19
5.3
Menu structure: Overview installer settings...............................
20
6 Commissioning
21
6.1
Checklist before commissioning ................................................
21
6.2
Checklist during commissioning ................................................
21
6.2.1
To perform an air purge .............................................. 21
6.2.2
To perform a test run .................................................. 22
6.2.3
To perform an actuator test run .................................. 22
6.2.4
To perform an underfloor heating screed dryout......... 22
7 Hand-over to the user
22
7.1
About locking and unlocking....................................................... 23
To activate or deactivate a function lock .................................... 23
To activate or deactivate button lock .......................................... 23
8 Technical data
23
8.1
Piping diagram: Outdoor unit...................................................... 23
8.2
Wiring diagram: Outdoor unit ..................................................... 24
1
About the documentation
1.1
About this document
Target audience
Authorised installers
Documentation set
This document is part of a documentation set. The complete set
consists of:
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages
are translations.
Technical engineering data
▪ A
subset
of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The
full set
of latest technical data is available on the Daikin
extranet (authentication required).
2
About the box
2.1
Outdoor unit
2.1.1
To remove the accessories from the
outdoor unit
1
Open the outdoor unit.
1×
2×
2×
2
Remove the accessories.