![background image](http://html.mh-extra.com/html/daikin/altherma-3-r-w/altherma-3-r-w_installers-reference-manual_501226220.webp)
10
|
Configuration
Installer reference guide
220
ERGA04~08EA + EHBH/X04+08EF
Daikin Altherma 3 R W
4P629085-1B – 2021.11
BBR16 activation
#
Code
Description
[9.9.F]
[7-07]
BBR16 activation
:
▪
0:
disabled
▪
1:
enabled
BBR16 power limit
#
Code
Description
[9.9.G]
[N/A]
BBR16 power limit
: This setting can only
be modified via the menu structure.
▪
0 kW~25 kW, step 0.1 kW
Energy metering
Energy metering
If energy metering is performed by the use of external power meters, configure the
settings as described below. Select the pulse frequency output of each power
meter in accordance with the power meter specifications. It is possible to connect
up to 2 power meters with different pulse frequencies. If only 1 or no power meter
is used, select '
None
' to indicate the corresponding pulse input is NOT used.
#
Code
Description
[9.A.1]
[D‑08]
Electricity meter 1
:
▪
0
None
: NOT installed
▪
1
1/10kWh
: Installed
▪
2
1/kWh
: Installed
▪
3
10/kWh
: Installed
▪
4
100/kWh
: Installed
▪
5
1000/kWh
: Installed
[9.A.2]
[D‑09]
Electricity meter 2
:
▪
0
None
: NOT installed
▪
1
1/10kWh
: Installed
▪
2
1/kWh
: Installed
▪
3
10/kWh
: Installed
▪
4
100/kWh
: Installed
▪
5
1000/kWh
: Installed
In case of pulse meter for photovoltaic panels:
▪
6
100/kWh for PV panel
: Installed
▪
7
1000/kWh for PV panel
: Installed
Summary of Contents for Altherma 3 R W
Page 292: ...11 11 ...
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ...4P629085 1B 2021 11 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...