
9
|
Electrical installation
Installer reference guide
133
ERGA04~08EA + EHBH/X04+08EF
Daikin Altherma 3 R W
4P629085-1B – 2021.11
Smart Grid contact
Smart Grid operation mode
1
2
0
0
Free running
0
1
Forced off
1
0
Recommended on
1
1
Forced on
The use of a Smart Grid pulse meter is not mandatory:
If Smart Grid pulse meter is…
Then [9.8.8]
Limit setting kW
is…
Used
([9.A.2]
Electricity meter 2
≠
None
)
Not applicable
Not used
([9.A.2]
Electricity meter 2
=
None
)
Applicable
In case of low voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5 mm²
Wires (low voltage Smart Grid contacts): 0.5 mm²
[9.8.4]=3 (
Benefit kWh power supply
=
Smart grid
)
[9.8.5]
Smart grid operation mode
[9.8.6]
Allow electrical heaters
[9.8.7]
Enable room buffering
[9.8.8]
Limit setting kW
The wiring of the Smart Grid in case of low voltage contacts is as follows:
14
13
S11S
6
5
S4S
4
3
X5M
S10S
10
9
a
2
1
a
Jumper (factory-mounted). If you also connect a safety thermostat (Q4L), replace
the jumper with the safety thermostat wires.
S4S
Smart Grid pulse meter
1
/S10S
Low voltage Smart Grid contact 1
2
/S11S
Low voltage Smart Grid contact 2
1
Connect the wiring as follows:
B
C
A
A
X5M.4
X5M.3
S4S
X5M.10
X5M.9
S10S
X5M.6
X5M.5
S11S
2
1
Summary of Contents for Altherma 3 R W
Page 292: ...11 11 ...
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ...4P629085 1B 2021 11 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...