11 Commissioning

Installation manual

15

4MWXM-A9
R32 Split series
3P600450-7T – 2022.09

1

4

3

2

1

A

1

2
3
4
5

SW5

4

3

2

1

2

OFF

ON

11

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during commissioning and
hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

11.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

Check  if  marks  (room  A~C  and  TO  TANK)  on  the  wiring
and piping match for each connected unit.

Check if the priority room setting is NOT set for 2 or more
rooms.  Keep  in  mind  that  the  DHW  tank  for  Multi  shall
NOT be selected as the priority room.

11.2

Checklist during commissioning

To perform a 

wiring

 check.

To perform an 

air purge

.

To perform a 

test run

.

11.3

Trial operation and testing

Before  starting  the  test  run,  measure  the  voltage  at  the
primary side of the 

safety breaker

.

The 

piping and wiring work

 match.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Initialization of the Multi system can take several minutes depending
on the number of indoor units and options used.

11.3.1

About wiring error check

INFORMATION

This  function  is  available  only  for  the  air-conditioning
indoor  units.  DHW  tank  wiring  MUST  be  check  manually,
automatic correction is NOT possible.

The  wiring  error  check  function  will  check  and  automatically  correct
any wiring errors. This is useful for checking wiring that CANNOT be
checked directly, such as underground wiring.

This function CANNOT be used within 3 minutes after activating the
safety  breaker  or  when  the  outside  air  temperature  is  ≤5°C  and  if
water temperature in DHW tank is ≥20°C.

To perform a wiring error check

INFORMATION

You  only  have  to  perform  a  wiring  error  check  if  you  are
not  sure  that  the  electrical  wiring  and  piping  is  connected
correctly.

1

Remove the service PCB switch cover.

Summary of Contents for 4MWXM52A2V1B9

Page 1: ...Installation manual R32 Split series English Installation manual R32 Split series 4MWXM52A2V1B9...

Page 2: ...a f r i henhold til bestemmelsene i noudattaen s nn ksi za dodr en ustanoven prema odredbama k veti a z zgodnie z postanowieniami urm nd prevederile 19 20 21 22 23 24 25 v skladu z dolo bami vastavalt...

Page 3: ...a TS TSmin Alhaisin matalapainepuolen l mp tila L C TSmax Suurinta sallittua painetta PS vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi...

Page 4: ...Commissioning 15 11 1 Checklist before commissioning 15 11 2 Checklist during commissioning 15 11 3 Trial operation and testing 15 11 3 1 About wiring error check 15 11 3 2 To perform a test run 16 1...

Page 5: ...he refrigerant piping securely before running the compressor If the refrigerant piping is NOT connected and the stop valve is open when the compressor is run air will be sucked in This will cause abno...

Page 6: ...n devices of the unit Do NOT touch live parts for 10 minutes after the power supply is turned off because of high voltage risk Please note that some sections of the electric component box are hot Make...

Page 7: ...ambient temperatures within the following ranges unless otherwise specified in the operation manual of the connected indoor unit DX operation range Cooling mode Heating mode 10 46 C DB 15 24 C DB DHW...

Page 8: ...ring refrigerant piping 5 1 1 Refrigerant piping requirements CAUTION Piping and joints of a split system shall be made with permanent joints when inside an occupied space except joints directly conne...

Page 9: ...ed taking into account the following requirements inside occupied spaces non permanent joints are NOT allowed for R32 refrigerant except for site made joints directly connecting the indoor unit to pip...

Page 10: ...est solution to all connections 3 Discharge all nitrogen gas 5 3 2 To perform vacuum drying DANGER RISK OF EXPLOSION Do NOT open the stop valves before the vacuum drying is finished NOTICE Connect the...

Page 11: ...vent these gases into the atmosphere When charging refrigerant ALWAYS use protective gloves and safety glasses Prerequisite Before charging refrigerant make sure the refrigerant piping is connected a...

Page 12: ...ctor d MR30_A MR30_B suspend lead wire connectors e S40 thermal overload relay lead wire and high pressure switch connector f Multimeter DC voltage range g S90 S92 S93 thermistor lead wire connector h...

Page 13: ...ox cover before turning ON the power supply 1 Insulate and fix the refrigerant piping and cables as follows g b a f e c d a Gas pipe b Gas pipe insulation c Interconnection cable d Field wiring if app...

Page 14: ...iority in the following cases Operation mode priority If the priority room function is set on an indoor unit all other indoor units enter the standby mode Priority during high power operation If the i...

Page 15: ...nsate water might drip The indoor unit receives the signals of the user interface The specified wires are used for the interconnection cable The fuses circuit breakers or locally installed protection...

Page 16: ...unit for about 20 minutes The difference should be more than 8 C cooling or 20 C heating 3 First check operation of each unit individually then check simultaneous operation of all indoor units Check b...

Page 17: ...ssor motor M F Fan motor M P Drain pump motor Symbol Meaning M S Swing motor MR MRCW MRM MRN Magnetic relay N Neutral n N Number of passes through ferrite core PAM Pulse amplitude modulation PCB Print...

Page 18: ...ler v Room A B C and Domestic hot water tank W c Heat exchanger thermistor m Discharge pipe thermistor w Field piping liquid d Refnet header n Compressor x Field piping gas e Fan motor o Accumulator y...

Page 19: ......