Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during commissioning and
hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

10.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

Check  if  marks  (room  A~C)  on  the  wiring  and  piping
match for each indoor unit.

Check  if  the  priority  room  setting  is  set  for  2  or  more
rooms. Keep in mind that the DHW generator for Multi or
the  Hybrid  for  Multi  shall  not  be  selected  as  the  priority
room.

10.2

Checklist during commissioning

To perform a 

wiring

 check.

To perform an 

air purge

.

To perform a 

test run

.

10.3

Trial operation and testing

For  the  Hybrid  for  Multi,  certain  precautions  are  required  before
using  this  function.  For  more  information,  see  the  indoor  unit
installation manual and/or the indoor installer reference guide.

Before  starting  the  test  run,  measure  the  voltage  at  the
primary side of the 

safety breaker

.

The 

piping and wiring work

 match.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Initialization of the Multi system can take several minutes depending
on the number of indoor units and options used.

10.3.1

About wiring error check

The  wiring  error  check  function  will  check  and  automatically  correct
any wiring errors. This is useful for checking wiring that CANNOT be
checked directly, such as underground wiring.

This function CANNOT be used within 3 minutes after activating the
safety breaker or when the outside air temperature is ≤5°C.

To perform a wiring error check

INFORMATION

▪ You only have to perform a wiring error check if you are

not  sure  that  the  electrical  wiring  and  piping  is
connected correctly.

▪ If you perform a wiring error check, the hybrid for multi

indoor unit will not operate by heat pump for 72 hours.
During this time, the gas boiler will take over the hybrid
operation.

1

Remove the service PCB switch cover.

Summary of Contents for 3AMXM52N2V1B9

Page 1: ...Installation manual R32 Split series English Installation manual R32 Split series 3AMXM52N2V1B9 3AMXF52A2V1B9 3MXF52A2V1B9 3MXF68A2V1B9...

Page 2: ...d til bestemmelsene i noudattaen s nn ksi za dodr en ustanoven prema odredbama k veti a z zgodnie z postanowieniami urm nd prevederile 19 20 21 22 23 24 25 v skladu z dolo bami vastavalt n uetele vado...

Page 3: ...ila TS TSmin Alhaisin matalapainepuolen l mp tila L C TSmax Suurinta sallittua painetta PS vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuo...

Page 4: ...ions 2008 S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 1091 Electromagnetic Compatibility Regulations 2016 following the provisions of BS EN 60335 2 40 as set out in A and judge...

Page 5: ...allowable pressure PS M C Refrigerant N Setting of pressure safety device P bar Manufacturing number and manufacturing year refer to model nameplate K L M TSmin TSmax PS N P 41 7 35 63 8 R32 41 7 bar...

Page 6: ...re commissioning 17 10 2 Checklist during commissioning 17 10 3 Trial operation and testing 17 10 3 1 About wiring error check 17 10 3 2 To perform a test run 18 10 4 Starting up the outdoor unit 18 1...

Page 7: ...mage and even injury CAUTION Incomplete flaring may cause refrigerant gas leakage Do NOT re use flares Use new flares to prevent refrigerant gas leakage Use flare nuts that are included with the unit...

Page 8: ...ion devices of the unit Do NOT touch live parts for 10 minutes after the power supply is turned off because of high voltage risk Please note that some sections of the electric component box are hot Ma...

Page 9: ...1 2 Additional installation site requirements of the outdoor unit in cold climates Protect the outdoor unit against direct snowfall and take care that the outdoor unit is NEVER snowed up a b c c d a...

Page 10: ...em shall be made with permanent joints when inside an occupied space except joints directly connecting the piping to the indoor units NOTICE The piping and other pressure containing parts shall be sui...

Page 11: ...eration system joining of parts with at least one part charged shall be performed taking into account the following requirements inside occupied spaces non permanent joints are NOT allowed for R32 ref...

Page 12: ...CE It is recommended that the refrigerant piping between indoor and outdoor unit is installed in a ducting or the refrigerant piping is wrapped with finishing tape 5 3 Checking the refrigerant piping...

Page 13: ...ght and CO2 equivalent Formula to calculate the quantity in CO2 equivalent tonnes GWP value of the refrigerant total refrigerant charge in kg 1000 Contact your installer for more information 6 2 To de...

Page 14: ...by the power supply Do NOT touch them with bare hands DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes and measure the voltage at the terminals of main circuit capacit...

Page 15: ...unit installation 8 1 To finish the outdoor unit installation DANGER RISK OF ELECTROCUTION Make sure that the system is earthed properly Turn OFF the power supply before servicing Install the switch b...

Page 16: ...on Setting it in the guest rooms is convenient 9 2 1 To set the priority room function 1 Remove the switch cover on the service PCB 2 Set the switch SW4 for the indoor unit for which you want to activ...

Page 17: ...pecified wires are used for the interconnection cable The fuses circuit breakers or locally installed protection devices are installed according to this document and have NOT been bypassed Check if ma...

Page 18: ...ling operation 4 When test run is finished set the temperature to a normal level In cooling mode 26 28 C in heating mode 20 24 C INFORMATION Test run can be disabled if necessary After the unit is tur...

Page 19: ...onnector D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Connector frame ground H Harness H P LED V L Pilot lamp light emitting di...

Page 20: ...6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT S1PH SV 9 5CuT 9 5CuT 6 4CuT 12 7CuT 15 9CuT d e f k a b c g i j d r A r B r C s t s t s t r A r B r C s t s t s t u u u d p o o n l l m l w x v A v B v C v A...

Page 21: ...nual 21 3AMXF A9 3AMXF A9 3AMXM N9 R32 Split series 3P600450 1R 2022 05 h Distributor r Electronic expansion valve Refrigerant flow cooling i Muffler with filter s Thermistor liquid Refrigerant flow h...

Page 22: ......

Page 23: ......

Page 24: ...3P600450 1R 2022 05 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...

Reviews: