4) Refrigerant Charging
Charge refrigerant while operating a compressor as shown above.
5) Pinch a charging pipe with a pinch-off plier after completion of charging.
6) Braze the end of a pinched charging pipe with copper brazer and take
a gas leakage test on the welded parts.
4.Refrigerant charging.
Bombe
Compressor
Evaporator
Condenser
Dryer
Hot Pipe
* Take a leakage test on the welded or suspicious area with an
electronic leakage tester.
5. Gas-leakage test
* Check each pipe is placed in its original place before closing
a cover back-M/C after completion of work.
6. Pipe arrangement
in each cycle
8-4. Standard Regulations for Heavy Repair
1) Observe the safety precautions for gas handling.
2) Use JIG (or wet towel) in order to prevent electric wires from burning during welding.
(In order to prevent insulation break and accident.)
3) The inner case shall be melted and insulation material (polyurethane) shall be burnt
if not cared during welding inner case parts.
4) The copper pipe shall be oxidized by overheating if not cared during welding.
5) Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)
6) Make sure that the inner diameter should not be distorted while cutting a capillary tube.
7) Be sure that a suction pipe and a filling tube should not be substituted each other during welding.
( High efficiency pump.)
Summary of Contents for FRS-20BD
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 33: ...32 5 1 Wiring Diagram 5 DIAGRAM FRS 20BD 24BD Basic Model...
Page 34: ...33 FRS 20DD FD 24DD FD Dispenser Model...
Page 66: ......
Page 67: ......
Page 69: ...68 9 5 Dispenser Water Flow Dispenser Models Only...
Page 70: ...CABINET 69 10 EXPLODED VIEW 10 1 FRS 20BD 24BD Basic Model...
Page 71: ...EXPLODED VIEW MECH ROOM 70...
Page 72: ...EXPLODED VIEW R Room 71...
Page 73: ...72 EXPLODED VIEW F ROOM...
Page 74: ...73 EXPLODED VIEW F DOOR...
Page 75: ...74 EXPLODED VIEW R DOOR...
Page 81: ...EXPLODED VIEW 10 3 FRS 20DD FRS 24DD Dispenser Only CABINET 80...
Page 82: ...EXPLODED VIEW MECH ROOM 81...
Page 83: ...EXPLODED VIEW R Room 82...
Page 84: ...83 EXPLODED VIEW F ROOM...
Page 85: ...EXPLODED VIEW F Door 84...
Page 86: ...85 EXPLODED VIEW R Door...
Page 92: ...EXPLODED VIEW 10 5 FRS 20FD FRS 24FD Dispenser Homebar CABINET 91...
Page 93: ...EXPLODED VIEW MECH ROOM 92...
Page 94: ...EXPLODED VIEW R Room 93...
Page 95: ...94 EXPLODED VIEW F ROOM...
Page 96: ...EXPLODED VIEW F Door 95...
Page 97: ...96 EXPLODED VIEW R Door...