59
* Pipe Connection
Connect a red hose to the high pressure side and a blue hose
to the low pressure side.
* Vacuum Sequence
Open
①
,
②
valves and evacuate for 40 minutes.
Close valve
①
.
3.Vacuum degassing.
Precautions
Items
* Charging sequence
1)
Check the amount of refrigerant supplied to each model after
completing vacuum degassing.
2) Evacuate bombe with a vacuum pump.
3) Measure the amount of refrigerant charged.
- Measure the weight of an evacuated bombe with an electronic scale.
- Charge refrigerant into a bombe and measure the weight. Calculate
the weight of refrigerant charged into the bombe by subtracting the
weight of an evacuated bombe.
4.Refrigerant charging.
Compressor
Evaporator
Dryer
Condenser
Vaccum
Pump
Hot Pipe
Blue
Yellow
Red
High
Pressure
Low
Pressure
①
②
※
KEYPOINTING
1) If power is applied during vacuum degassing, vacuum degassing
shall be more effective.
2) Operate compressor while charging refrigerant. (It is easier and
more certain to do like this.)
the amount of refrigerant charged
= a weight after charging
- a weight before charging
(a weight of an evacuated cylinder)
Calculation of amount of refrigerant charged
※
KEYPOINTING
1) Be sure to charge
the refrigerant at
around 25
°
C.
2) Be sure to keep
-5g in the winter
and +5g in summer.
Indicate the weight of
an evacuated bombe
Summary of Contents for FRS-20BD
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 33: ...32 5 1 Wiring Diagram 5 DIAGRAM FRS 20BD 24BD Basic Model...
Page 34: ...33 FRS 20DD FD 24DD FD Dispenser Model...
Page 66: ......
Page 67: ......
Page 69: ...68 9 5 Dispenser Water Flow Dispenser Models Only...
Page 70: ...CABINET 69 10 EXPLODED VIEW 10 1 FRS 20BD 24BD Basic Model...
Page 71: ...EXPLODED VIEW MECH ROOM 70...
Page 72: ...EXPLODED VIEW R Room 71...
Page 73: ...72 EXPLODED VIEW F ROOM...
Page 74: ...73 EXPLODED VIEW F DOOR...
Page 75: ...74 EXPLODED VIEW R DOOR...
Page 81: ...EXPLODED VIEW 10 3 FRS 20DD FRS 24DD Dispenser Only CABINET 80...
Page 82: ...EXPLODED VIEW MECH ROOM 81...
Page 83: ...EXPLODED VIEW R Room 82...
Page 84: ...83 EXPLODED VIEW F ROOM...
Page 85: ...EXPLODED VIEW F Door 84...
Page 86: ...85 EXPLODED VIEW R Door...
Page 92: ...EXPLODED VIEW 10 5 FRS 20FD FRS 24FD Dispenser Homebar CABINET 91...
Page 93: ...EXPLODED VIEW MECH ROOM 92...
Page 94: ...EXPLODED VIEW R Room 93...
Page 95: ...94 EXPLODED VIEW F ROOM...
Page 96: ...EXPLODED VIEW F Door 95...
Page 97: ...96 EXPLODED VIEW R Door...