10-3 Right Crankcase Cover Removal
Remove left
footrest.
Drain out the engine oil and coolant, and then
remove coolant hoses.
Remove water pump cover (4 bolts).
Remove 11 bolts from the right crankcase cover.
Remove the right crankcase cover.
Remove dowel pin and gasket.
10-4 A.C.G. Set Removal
Remove 2 mounted screw s from pulse generator
and then remove it.
Remove 3 screws from right crankcase cover and
then remove generator coil set.
10-5 Right Cover Bearing
Inspection
Rotate the bearing with finger to check if the
bearing rotation is in smooth and silent.
Check if the bearing outer parts are closed and
fixed. Replace it if necessary.
Remove the cir clip, and then remove bearing.
Special tool:
Inner bearing puller
11 bolts
Water pump cover bolts
2 screws
3 screws
Cir clip
Summary of Contents for ET-250
Page 1: ...1 ET 250...
Page 51: ...Use 32 cutter to cut a quarter upper parts out...
Page 54: ......
Page 60: ...7 1 Mechanism Diagram 0 8 1 2kgf m 1 0 1 4kgf m...
Page 67: ...7 7 Cylinder Installation Install dowel pins and new gasket Dowel pins...
Page 96: ...10 1 Mechanism Diagram 5 0 6 0kgf m 1 0 1 4kgf m 0 8 1 2kgf m...
Page 140: ...REAR BRAKE...
Page 158: ......
Page 159: ...17 8 WIRING DIAGRAM...