10
2.
MAINTENANCE
2.1 MAINTENANCE DATA
2.8 IDLE SPEED
2.2 MAINTENANCE SCHEDULE
2.9 DRIVE CHAIN
2.3 FUEL TUBLE
2.10 BRAKE SYSTEM
2.4 THROTTLE OPERATION
2.11 WHEELS AND TIRES
2.5 THROTTLE CABLE AJUSTMENT
2.12 STEERING SYSTEM
2.6 AIR CLEANER
2.13 TOE-IN
2.7 SPARK PLUG
2.1 MAINTENANCE DATA
SPECIFICATION
SPARK PLUG
SPARK PLUG GAP
0.8 mm
RECOMMENDED SPARK PLUGS
NGK CR8E
THROTTLE LEVER FREE PLAY
5-10 mm
IDLE SPEED
1700
±
100 rpm
BRAKE LEVER FREE PLAY
15-25 mm
DRIVE CHAIN SLACK
10-25 mm
TOE-IN
5
±
10 mm
TORQUE VALUES
SPARK PLUG
12-19 N.m
TIE-ROD LOCK NUT
35-43 N.m
ENGINE OIL
1.4 Liter (1.2Liter for change)
GEAR LUBRICATION OIL
750cc (650cc for change)
Summary of Contents for ET-250
Page 1: ...1 ET 250...
Page 51: ...Use 32 cutter to cut a quarter upper parts out...
Page 54: ......
Page 60: ...7 1 Mechanism Diagram 0 8 1 2kgf m 1 0 1 4kgf m...
Page 67: ...7 7 Cylinder Installation Install dowel pins and new gasket Dowel pins...
Page 96: ...10 1 Mechanism Diagram 5 0 6 0kgf m 1 0 1 4kgf m 0 8 1 2kgf m...
Page 140: ...REAR BRAKE...
Page 158: ......
Page 159: ...17 8 WIRING DIAGRAM...