a D:GROUP Company
00055EN Rev.10 – 12/2011
46
16 PROCEDURE FOR CytoFAST Top ASSEMBLY
Would the cabinet be delivered disassembled, follow the procedure shown below to assemble it:
- Unpack all parts of the cabinet following the instructions at page 2 point 2A. of the manual
- Assemble the base joining the two parts “2!” together by means of the three parts “3” and use TC M5x16
screws with the relevant washers “4” as shown in the figure below.
- When the assembly of the base is over, check the stability by adjusting the feet “9”
- Lift the main body “1” by suitable lifting means after slinging it carefully and safely and anchoring it to the
four upper eyebolts “5” in strict compliance with the regulations presently in force.
- Position the main body “1” on the base, taking care to fit the two parts together, then remove the panel “6”
loosing the proper fastening screws “8”
- Assemble the two parts by the M5x16 screws and the relevant washers “7”
-
Re-assemble the panel “6” with the relevant screws “8” and free the cabinet from the sling.
Summary of Contents for FASTER CytoFAST Top
Page 25: ...a D GROUP Company 00055EN Rev 10 12 2011 24 Picture 1 Picture 2 ...
Page 39: ...a D GROUP Company 00055EN Rev 10 12 2011 38 Side view ...
Page 41: ...a D GROUP Company 00055EN Rev 10 12 2011 40 Side diagram ...
Page 42: ...a D GROUP Company 00055EN Rev 10 12 2011 41 13 C SAFE WORKING AREA DIAGRAM ...