
DGS-3200 Series Layer 2 Gigabit Ethernet Managed Switch
10
Mounting the Switch in a Standard 19" Rack
Figure 2- 5. Installing the DGS-3200-10 in a rack
Figure 2- 6. Installing the DGS-3200-16 in a rack
Power On
1. Plug one end of the AC power cord into the power connector of the Switch and the other end into the local power source
outlet.
2. After powering on the Switch, the LED indicators will momentarily blink green. This blinking of the LED indicators
represents a reset of the system.
Power Failure
As a precaution, in the event of a power failure, unplug the Switch. When power is resumed, plug the Switch back in.