78
D-Link ShareCenter™ 2Go User Manual
Section 3 - Configuration
Scheduling
Schedule Backups List
Progress
Download URL
Save To
Modify
Delete
Displays the progress of the file or folder that is being
downloaded. If the download is a file, this field uses
a bar and percentage value to indicate the download
progress. If the download is a folder, the field only
indicates when the download has completed and
does not indicate the progress of the folder download.
Indicates the source URL/file path.
If a file is available for download, click the
Now
Download
button to start downloading the file.
Indicates the location on the ShareCenter™ 2Go that
the download file/folder will be saved to.
Select the Backup and then click Modify to view the
settings in the Schedule Backups Settings. Then edit
them as required.
To remove a download from the Schedule List, click
the backup download to select it and then click the
Delete
button.
The Schedule Backup’s List displays the completed, active, and pending scheduled downloads and backups.