REV: 101404
7
4.
Power
on:
Connect the power cord to a power outlet and turn the power switch to the on
position; the DI-713 will automatically enter the self-test phase. When it is in the self-
test phase, the indicators M1 and M2 will be lit for about 10 seconds, and then M1
and M2 will flash 3 times to indicate that the self-test operation has finished. Finally,
the M1 will continuously flash once per second to indicate that the DI-713 is in
normal operation.