Chapter 3 Switch Installation
DGS-8000 Series Hardware Installation Guide
42
3.1
Installation Flow
3.2
Installation Verification
The DGS-8000 is complicated equipment, so you must carefully plan and arrange the
installation location, networking mode, power supply, and wiring before installation.
Verify the following before installation:
The installation location is of a good air flow.
The installation location meets the temperature and humidity requirements of the
equipment.
The qualified power supply is available at the installation location.
The related network cables have already been deployed at the installation location.