D+H RZN 43-E Series Instructions For Use Manual Download Page 13

1

2

ON

F0.125A

F0.125A

F1.25A

F6.3A

TEST

AE

526-DG

1

2

ON

RZN 43xx-E

13/16

99.821.70 3.5/01/12

AE

525-A

0

I

F6,3A

F1,25A

TEST

F0,125A

- window-lock plug-in card for triggering of

max. 8 pressure-gas generators

- release via smoke vent buttons and/ or fire

detectors

- LE 513 is not required

Releases

1

2

4

8

16

24

30

cable 4 x 0,6

100

50

25

/

/

/

/

m

cable 4 x 1,5²

600

300 150

75

30

/

/

m

cable 4 x 2,5²

1000 500 250 125 60

45

30 m

Releases

1

2

4

6

8

cable 2 x 0,8 (2 x 2 x 0,6)

150 130

90

50

10

m

cable 2 x 1,5²

450 400 270 140 20

m

cable 2 x 2,5²

750 650 450 240 35

m

Pressure gas generators:

cross section (mm²) =

400

simple cable lenght (m) x no. of releases

Tripping devices:

Window-lock plug-in card AE 526-DG

- window-lock plug-in card for triggering of

max. 30 window-lock units of type ABF 12

- release via smoke vent buttons and/ or fire

detectors

- LE 513 is not required

Window-lock plug-in card AE 525-A

Function of DIP- switches:

S1-1 on ON

failure = alarm

S1-2

-no function-

DIP-switch
factory setting

DIP-switch
factory setting

Function of DIP- switches:

S1-1 on ON

failure = alarm

S1-2

-no function-

5

6

7

1

2

3

4

10

11

8

9

AE 525-A

RZN 43xx-E

fire

detector

Smoke vent

button

type*

RT 45

10k *

W

10k *

W

10k *

W

out

out

in

in

line

line

+control

+alarm

closed

2

2

8

8

3

3

1

1

6

6

4

4

last or
single

first or
penultimate

RT

4

5

line

line

+control

+alarm

close

StL

A+

monitored

A-

OK

1

2

4

5

1

2

4

5

-

+

branch
box

M

M

ABF 12

ABF 12

-

+

Tripping devices

YR 0,8

YR 0,8

according to D+H table
for layout of cables

insert
bridge!

* fire detector

Only D+H approved
detector permissible

fire

detector

smoke vent

button

type*

RT 45

10k *

W

10k *

W

10k *

W

out

out

in

in

line

line

+control

+alarm

close

2

2

8

8

3

3

1

1

6

6

4

4

RT

4

5

line

line

+control

+alarm

n.c.

StL

+DG

monitored

-DG

5

6

7

1

2

3

4

10

11

8

9

AE 526-DG

OK

branch
box

RZN 43xx-E

DG

DG

YR 0,8

YR 0,8

according to

D+H table for

layout of cables

last or
single

first or
penultimate

pressure gas generator

(max. 8 pce.)

Summary of Contents for RZN 43-E Series

Page 1: ...nstallation commissioning repair and service The highest national and international quality standards are therefore reliably fulfilled The comprehensive network of D H service and sales partners is at...

Page 2: ...d by D H for carrying out this maintenance competently and will be automatically provided with the latest maintenance instructions Following tests must be carried out during maintenance External exami...

Page 3: ...heat ventilation system under alarm conditions will occur if the inner temperature exceeds 72 C caused by the radiant heat from a fire in the immediate vicinity of the installation location VE 530 Se...

Page 4: ...er power lines In case of a cable with green yellow this must Cable and terminal boxes have to be labeled ground wire not be used Slot E1 E2 AM 44 Z Alarm cutoff module TR 42 Cutoff relay module WFR 4...

Page 5: ...function can be deactivated via the servicetool Attention Reset of the service timer can be carried out by a specialist company only who has been authorized by the appliance manufacturer close red gre...

Page 6: ...switched OFF ON for Smoke Detector Reset at the control panel This line is released by a line connected in series Every previous plug in slot after the releasing line must be occupied Both the lines...

Page 7: ...rst to penultimate smoke vent button each Malfunc tion 1 shunt connection by customer Line plug in card LE 513 continuation Parallel connection of RT 45 on LE 513 Terminal resistor for line monitoring...

Page 8: ...During a period of 30 minutes the smoke vent is triggered at intervals of 2 minutes in accordance with VdS 2581 The group plug in card can be triggered in OPEN direction viaAz signals The group plug i...

Page 9: ...llel 3 wires for each drive line simple cable length m x total current total consumption 1 2 3 4 5 6 7 8 9 10 A 3x 1 5 mm 120 60 40 30 24 20 17 15 13 12 m 3x 2 5 mm 200 100 65 50 40 33 28 25 22 20 m 5...

Page 10: ...s overridden in the case of an alarm from the Smoke and heat vent system The function Master CLOSE e g in the case of rain or a timer has a higher priority than the servo function and can be activated...

Page 11: ...g Mot a Mot b drive with SGI or ZA SG SG I black black orange 2x47kW branch box by customer terminal module EM 47 K LT MOT Mot a Mot b HS SG I SG I SGI 0 10 V 0 10 V SG 0 10 V 0 20 mA 4 20 mA BMS Mot...

Page 12: ...1 ZMP2 1 2 3 4 5 6 7 8 9 10 11 WE 516 rain wind wind 1 2 4 3 5 7 6 8 9 R W WRG 82 S 1 1 S 1 2 P3 P4 rain wind N AZ ZZ1 T ITR 79 1 6 2 7 4 3 5 230VAC 5 1 3 RTR 230 open close potential free wind rain i...

Page 13: ...w lock plug in card AE 525 A Function of DIP switches S1 1 on ON failure alarm S1 2 no function DIP switch factory setting DIP switch factory setting Function of DIP switches S1 1 on ON failure alarm...

Page 14: ...1 Bridge diagnostic pin against middle pin on line plug in card Check fuse connections cables t clamps smoke detectors and external control 2 Bridge diagnostic pin against middle pin on line plug in c...

Page 15: ...rol panel with reset button 2 Press concealed button in smoke vent button smoke vent closes 3 Red display LED in button and on line plug in unit goes out 1 Trigger external control if available 2 Smok...

Page 16: ...org Sasse Str 28 32 22949Ammersbek Tel 40 605 65 Fax 40 605 65 254 Germany 49 239 49 E Mail info dh partner com www dh partner com 2010 D H Mechatronic AG Ammersbek Technische nderungen vorbehalten Ri...

Reviews: