![D+H RZN 43-E Series Instructions For Use Manual Download Page 13](http://html1.mh-extra.com/html/d-h/rzn-43-e-series/rzn-43-e-series_instructions-for-use-manual_3081704013.webp)
1
2
ON
F0.125A
F0.125A
F1.25A
F6.3A
TEST
AE
526-DG
1
2
ON
RZN 43xx-E
13/16
99.821.70 3.5/01/12
AE
525-A
0
I
F6,3A
F1,25A
TEST
F0,125A
- window-lock plug-in card for triggering of
max. 8 pressure-gas generators
- release via smoke vent buttons and/ or fire
detectors
- LE 513 is not required
Releases
1
2
4
8
16
24
30
cable 4 x 0,6
100
50
25
/
/
/
/
m
cable 4 x 1,5²
600
300 150
75
30
/
/
m
cable 4 x 2,5²
1000 500 250 125 60
45
30 m
Releases
1
2
4
6
8
cable 2 x 0,8 (2 x 2 x 0,6)
150 130
90
50
10
m
cable 2 x 1,5²
450 400 270 140 20
m
cable 2 x 2,5²
750 650 450 240 35
m
Pressure gas generators:
cross section (mm²) =
400
simple cable lenght (m) x no. of releases
Tripping devices:
Window-lock plug-in card AE 526-DG
- window-lock plug-in card for triggering of
max. 30 window-lock units of type ABF 12
- release via smoke vent buttons and/ or fire
detectors
- LE 513 is not required
Window-lock plug-in card AE 525-A
Function of DIP- switches:
S1-1 on ON
failure = alarm
S1-2
-no function-
DIP-switch
factory setting
DIP-switch
factory setting
Function of DIP- switches:
S1-1 on ON
failure = alarm
S1-2
-no function-
5
6
7
1
2
3
4
10
11
8
9
AE 525-A
RZN 43xx-E
fire
detector
Smoke vent
button
type*
RT 45
10k *
W
10k *
W
10k *
W
out
out
in
in
line
line
+control
+alarm
closed
2
2
8
8
3
3
1
1
6
6
4
4
last or
single
first or
penultimate
RT
4
5
line
line
–
–
+control
+alarm
close
StL
A+
monitored
A-
OK
1
2
4
5
1
2
4
5
-
+
branch
box
M
M
ABF 12
ABF 12
-
+
Tripping devices
YR 0,8
YR 0,8
according to D+H table
for layout of cables
insert
bridge!
* fire detector
Only D+H approved
detector permissible
fire
detector
smoke vent
button
type*
RT 45
10k *
W
10k *
W
10k *
W
out
out
in
in
line
line
+control
+alarm
close
2
2
8
8
3
3
1
1
6
6
4
4
RT
4
5
line
line
–
–
+control
+alarm
n.c.
StL
+DG
monitored
-DG
5
6
7
1
2
3
4
10
11
8
9
AE 526-DG
OK
branch
box
RZN 43xx-E
DG
DG
YR 0,8
YR 0,8
according to
D+H table for
layout of cables
last or
single
first or
penultimate
pressure gas generator
(max. 8 pce.)