background image

4.5

19/48

LSC 44-M4

99.823.35 1.2/06/09

Tube Project Planning Guideline

Foil
Ø 4,6

Foil
Ø 3,2

Foil
Ø 2,0

Foil
Ø 5,0

Foil
Ø 3,4

Foil
Ø 2,5

Foil
Ø 3,6

Foil
Ø 3,0

Foil
Ø 3,8

Foil
Ø 3,2

Foil
Ø 3,4

Foil
Ø 3,6

Tube length < 15m

2 borings

(pre-drill Ø 10mm)

Tube length 15-25m

4 borings

(pre-drill Ø 10mm)

Tube length 25-40m

6 borings

(pre-drill Ø 10mm)

Summary of Contents for LSC-M Series

Page 1: ...Instruction for use Lift Smoke Control LSC M System for Lift Shaft and Staircase Smoke Vent...

Page 2: ......

Page 3: ...7 2 5 Guarantee 7 3 1 Functional Principle 9 3 2 Why Smoke Suction 10 3 3 Wiring Plan Lift Shaft 11 3 4 3 5 Cable for D H Smoke and Heat Vent Systems 13 3 6 Line lenghts and Cross sections 13 3 7 Proj...

Page 4: ...BMS RM RT 39 5 22 Connection REM LT MOT BZ BL 40 6 1 Louvre Drive 41 6 2 Domelight 41 6 3 Informations for Mounting of Louvres Domelight 42 6 4 Display Panel EF 43 LSC 42 6 5 Key operated vent button...

Page 5: ...e owner By omission of an express marking of the trade name shall not be given the impression that the tradename was not protected by a third party Legal Aspects Legal Aspects using electric motor con...

Page 6: ...as generally increasing energy costs The D H system LSC avoids unnecessary losses of energy because a permanent opening in the top end area of the lift shaft is avoided and with this an uncontrolled...

Page 7: ...lease of the SHEV function which will run the lift to the predetermined main evacuating level This will be usually the main entrance area smoke suction system in the lift shaft and a smoke detector st...

Page 8: ...nt elements of structural preventive fire protection Smoke and heat vent systems are appliances of preventive fire protection They fulfil important functions in case of fire as there are protection of...

Page 9: ...y undergo an in house training to ensure their qualification and experience According to DIN VDE 0108 section 1 paragraph 9 1 1 accumulators for emergency supply lead accumulators must be checked ever...

Page 10: ...230V 50Hz Mains supply Lift shaft Domelight with drive on lift shaft Tube system with accessories or rain detector VRS 10 key operated ventilation button Signal contact to Lift control optional Syste...

Page 11: ...LSC 09 48 LSC 44 M4 99 823 35 1 2 06 09 Functional Principle Smoke recognition Opening of the smoke vent flap Evacuating travels of lift car and activation of the staircase smoke vent Prevention of f...

Page 12: ...detector can not occur freely Why Smoke Suction 1 Suction opening 2 Suction tube 3 Domelight 4 Control panel 5 Smoke detector 6 Ventilation button 7 Smoke vent button RT 43 N 8 Window drive 9 Smoke d...

Page 13: ...e 600x600x210 230VAC 24VDC near the lift shaft Smoke vent button RT 43 LSC surface 24 VDC circa 1 5m above upper edge firm flooring by customer 55mm flush socket Vent button 24 VDC e g LT 43 circa 1...

Page 14: ...C near the lift shaft Smoke vent button RT 43 H N surface 24 VDC circa 1 5m above upper edge firm flooring by customer 55mm flush socket Vent button 24 VDC e g LT 43 circa 1 2 above upper edge firm fl...

Page 15: ...ening device is automatically triggered and opens up in case of fault when DIP switch 3 is on ON Smoke vent button cable and cable of automatic detectors weak current sheathed flexible cableYR 6 x 0 8...

Page 16: ...inspection of works or from the building right authorities which are only of local validity Guideline for automatic fire alarm systems planning and installation VdS Schadenverh tung GmbH VdS 2095 Wit...

Page 17: ...pe clamps 6 x PVC angles 90 2 x PVC bends 90 4 x PVC angles 45 6 x suction reducing foil 1 x tube of PVC adhesive agent 125 ml 1 x bottle of PVC purifying agent There is a 25 m Tube Set optionally ava...

Page 18: ...gths and changes of direction see fig 1 on the right have an extremely high air flow resistance Therfore use these only at places where they are inevitable for structural reasons If necessary the tube...

Page 19: ...irled up in the shaft pit with blowing through of the tube system Cut tubes to length pipe cutter or pipe shears 38mm metal cutting saw Burring Burring Suction tube PVC red Suction tube halogen free R...

Page 20: ...in critical areas If the tube system does not meet the project planning guidelines as described here because of structural facts it must be separately calculated by D H for the respective conditions...

Page 21: ...lanning Guideline Foil 4 6 Foil 3 2 Foil 2 0 Foil 5 0 Foil 3 4 Foil 2 5 Foil 3 6 Foil 3 0 Foil 3 8 Foil 3 2 Foil 3 4 Foil 3 6 Tube length 15m 2 borings pre drill 10mm Tube length 15 25m 4 borings pre...

Page 22: ...reducing foil type AF BR suction reducing foil type AF x bore 10mm hole Burring Glue on suction reducing foil Chose set up of suction opening suction boring and position of tube system according to th...

Page 23: ...swivel nuts 4 Screw filter housing directly on wall with housing lower part Exchange of Air Filters 1 Unscrew the 4 screws on housing cover 2 Remove housing cover 3 Remove filter elements 4 Clean care...

Page 24: ...e will be operated with 230V Only with this efficient compressed air device is a building up of a sufficient pressure volume possible for best possible cleaning The compressed air device is available...

Page 25: ...1 2 06 09 minimum 20cm Central Appliance LSC 44 M4 Displays must be easy visible in proximity of the shaft however not in the lift shaft protected and easy accessible for maintenance not in of doors o...

Page 26: ...404 M 24 48 LSC 44 M4 99 823 35 1 2 06 09 Inside Design of Control Center Central connecting pcb LSM 44 Test connection Stop valve Smoke suction device SHEV control system Accumulators for emergency s...

Page 27: ...ll receice instructions from externally connected manual or automatic transmitters will process them and run open and closed the electric drives in smoke vent devices The SHEV control panel can be use...

Page 28: ...or for ventilation time limitation Fuse Reset Piktograph explanation View motherboard RZN 4404 M VdS 1 2 3 Potentiometer for OPEN running time limitation potentiometer for ventilating time limitation...

Page 29: ...ultimate LT 43 L L P P RZN 4404 M Group 2 Drives brown blue black orange 2x47kW black brown blue thermal detector THE 4 RZN 4404 M Line 2 RM MOT branch box length of line and cross sections see page 1...

Page 30: ...tton RT 43 H Smoke vent button RT 43 N 10kW alarm alarm control control line line line line malfunction closed closed 2 2 7 8 7 3 3 1 1 6 6 4 4 alarm alarm zu closed red red green green yellow malfunc...

Page 31: ...rection Switch 4 on OFF Key operation in CLOSED direction Switch 5 on ON Storage operation in OPEN direction Switch 5 on OFF Key operation in OPEN direction Switch 6 on ON Group CLOSED in case of alar...

Page 32: ...smoke detectors of one line respond False alarm of one smoke detector will be prevented Two smoke detectors in one room must be always installed If only one smoke detector is connected to one line swi...

Page 33: ...ON OFF LED s will light up for 3 seconds in control panel Switch 1 on OFF Switch 2 on ON Central alarm Switch 3 on ON Power failure CLOSED ON Switch 4 on ON Switch 5 Switch 6 on ON LED Test Reset WDT...

Page 34: ...locking Two smoke detectors dependency Smoke detector alarm only to be reset in control panel Line fault Alarm Idle OPEN running time limitation Ventilating time limitation OPEN retriggering Duty cycl...

Page 35: ...acilitates to use the SHEV system for ventilation purposes as well This will be effected via ventilation button or a floating contact in neutral position of another control system A time controlled au...

Page 36: ...ctor module Airflow detector Suction unit the airflow detector is integrated in detector module Put suction tube in tube connection at housing of LSC 44 in case of variations in temperature the tube w...

Page 37: ...oo strongly varying temperature adjustment ventilator voltage can be adjusted according to the regulations ventilator and ventilator power pack are working normally measurement of temperature is fault...

Page 38: ...icators centrally on this module In case of alarm the lift control will be selected by means of a floating contacts in neutral position These contacts have following functions Furthermore following fu...

Page 39: ...ndicated on low tension side for acoustic alarm devices will not be indicated SHEV alarm will be indicated on low tension side for acoustic alarm devices will not be indicated Setting of duration for...

Page 40: ...interruption of motor or battery circuit as well as interruption or short circuit of the SHEV button smoke detector circuits or of the automatic smoke suction system The floating contact can be loade...

Page 41: ...control line line malfunction closed alarm red green yellow SHEV alarm can be released via floating contact in neutral position of a BMS Possibility of ventilation will be automatically closed in cas...

Page 42: ...FG 1 2 1 2 40 48 LSC 44 M4 99 823 35 1 2 06 09 2x47kW black orange black Drive brown blue 2 resistors 47k or terminal module W thermal detector THE 4 branch box last Alarm siren flashing light Key ope...

Page 43: ...has a rated quantity of 900x600mm and a PVC upstand of 15 30cm height for a connection appropriate for the material involved to the roof area The domelight consists of double pane opaline acrylic glas...

Page 44: ...rds etc so that the operating safety of the system will be ensured Louvre windows must be always vertically installed No mechanical stress must be exercised on the louvres by mounting Alterations or r...

Page 45: ...in ventilation operation It will extinguish again if the drive is in closed position The vent button can be alternatively activated as well via floating contact in neutral position of another control...

Page 46: ...a Closed Reset button in a SHEV button this Fasten detector with 2 screws Close cable bushings which are not used A protective cap is available for avoiding dirt accumulation during construction see f...

Page 47: ...99 823 35 1 2 06 09 terminal resistor line terminal resistor Fire detector FO 1362 first fire detector second to penultimate last fire detector fire detector type Connection of one fire detector Conn...

Page 48: ...ng to VdS 2592 However locally variant other colours can be demanded Please consult your D H partner Technical Data Voltage 24V 4V Alarm circuit 20 mA Temperature range 5 C to 40 C green red yellow sy...

Page 49: ...cally variant other colours can be demanded Please consult your D H partner Technical Data Voltage 24V 4V Alarm circuit 20 mA Temperature range 5 C to 40 C green red yellow system is operable meaning...

Page 50: ...ower supply 24V 0 25A flashing light Alarm siren Display panel for optical and acoustical indication of general alarm and general fault Optical indication of power failure Type SF 43 AZ with cut off b...

Page 51: ......

Page 52: ...ng Service Sales 2005 D H Mechatronic AG Ammersbek D H Mechatronic AG Georg Sasse Str 28 32 22949 Ammersbek Hamburg Germany Phone 49 40 605 65 0 Fax 49 40 605 65 222 info dh partner com www lsc dh par...

Reviews: