17
Setting Up the miSAN
Cybernetics
UM-MV-86-B1-0801
Chapter 2
Setting
Up
the
miSAN
This chapter provide requirements and instructions for unpacking and installing the
miSAN-V-Series:
•
Installation Requirements
•
Installing the Hardware and Software Components
•
Connecting the Cables
•
Configuring the Network and iSCSI Settings
•
Setting Up the miSAN-V-Series Virtual Components
•
Testing the Installation
To ensure correct installation and proper operation, make sure all the items listed in
“Installation Requirements” are available before beginning.
Installation Requirements
Make sure the following are available before beginning the installation:
•
Level surface (or 2U rackmount space) near a readily accessible power outlet
•
Cybernetics miSAN-V-Series unit
•
Rackmount hardware kit and tools for rackmount installations
•
Standard, 3-prong AC power cord (IEC320 C13 to NEMA 5-15P) for each power
supply (2 cords)
•
Ethernet cable (CAT 5e or 6 unshielded twisted pair with RJ-45 connector) for each
standard network interface (3)
•
Parallel SCSI cable with male, 68-pin connector for each SCSI device. Depending on
case configuration, the required connector may be either VHDCI 68-pin or High
Density
68-pin socket (Ultra Wide SCSI-3).
•
Either the Microsoft® Internet Explorer 6.0 or Mozilla™ Firefox® 1.0 Web browser
with the Java™ plug-in version 1.4.2 or later, and telnet client software, on a network
accessible host system for configuration and operation of the miSAN-V-Series
Summary of Contents for miSAN-V6
Page 104: ...104 Operating the Web Control Panel Cybernetics UM MV 86 B1 0801 ...
Page 110: ...110 Telnet Menu System Cybernetics UM MV 86 B1 0801 ...
Page 146: ...146 Packing and Shipping Instructions Cybernetics UM MV 86 B1 0801 ...
Page 174: ...174 Cybernetics UM MV 86 B1 0801 ...
Page 182: ...182 Cybernetics UM MV 86 B1 0801 ...
Page 184: ...184 Cybernetics UM MV 86 B1 0801 ...