Part No. 4801-5120 Rev. 1-2020
Mega-Cool System
Page 34 of 48
INSTRUCTIONS - Connect Pump to Spray Line
NOTE: The total vertical height of pipe sections in the
following instructions must reach from Sump Pump to level
of spray line. Adjust lengths of pipe sections as required
for proper height. For proper alignment, cut and assemble
all pieces of pipe and fittings before gluing together.
1. Cut pieces of 1 ½" pipe supplied to lengths needed and glue
together with appropriate fittings called out as shown at the left.
When cutting pieces of 1 ½" pipe, notice that the pump supply
line must rest in slotted pipe and align with 8" pipe as shown in
the Figure on Page 30.
2. Next, assemble remaining supply line assembly as shown at
the left using fittings called out and 1 ½" pipe supplied. Cut 1 ½"
pipe into necessary lengths required. When gluing all pieces
together be sure that bottom part of supply line assembly
containing filter is rotated to properly align and connect with
pump supply line extending from slotted pipe at top of Tee-Tank
assembly.
3. Once assembled, align and connect all supply lines as shown
on Pages 30 and 31.
12” PVC
cap Cap
1 ¼" to 1
½"
Reducer
Filter
Pump
1 ½"Male
Threaded
Union
1 ½" 90º
Elbow
Threaded Union
12"x12" Pipe with cut
channel
12"x8" Tee
8"x22 ½ º
Elbow
12"
Bottom Cap
12"x3'
Reservoir
and Pump
1 ½" to 1"
Reducing Tee
1 ½" Ball Valve
(Primary Flow
Regulator)
Ground Level
NOTE: The Pump housing is designed to be
installed below ground level.
1 ½" 90º
Elbow
½"x90º
Elbow
Drain Support
Brackets
1" Ball
Valve
½" Threaded
Coupling
Mega-Cool Sump Pump Assembly