Part No. 4801-5120 Rev. 1-2020
Mega-Cool System
Page 31 of 48
Flush System
– In-Line Pump (End
Mount Systems up to 80 ft.)
It is very important to flush the system. After completing
system assembly, follow steps below in order to flush out
debris from pipes.
1. Open ball valve at end of system. See diagram above.
2. Turn on water. Fill reservoir t fill line. Fill the Strainer
Basket.
WARNING
: Do not over tighten the Strainer Basket lid. Hand-Tight ONLY.
3. Turn on In-Line Pump to flush out system.
4. After flushing system, turn off In-Line Pump.
5. Close ball valve at end of spray line.
6. Clean In-Line Filter.
7. Resume normal operation.
NOTES:
1. Expect about 70 gallons of water per 50
feet of reservoir pipe.
2. Lubricate the strainer basket lid seal with
Vaseline to ensure vacuum-tight seal.
Front View
Ball Valve
Pump
To Water Supply
Union
Strainer Basket
In-Line Filter