7
•
Note:
When installing the
LiDAR/RVC assembly, make
sure to route the LiDAR
cable as seen below.
•
Reinstall the RVC/blower
subassembly to the
mounting plate using the 4
screws that were previously
removed.
•
The light array will now be mounted to the top half of the manual lift
(SF749). This will allow for the remaining components to be mounted
and cables and tubing to be routed.
SF973-INST