11
•
Cut an HW4077 hose clamp to appx. 18 in. and grind down sharp
corners. Cut appx. 9” of heat shrink (PN 712586) and slide to appx. 1.5”
from the screw housing. Heat up the tubing to shrink it in place.
•
Repeat for the other HW4077 hose clamp.
•
Note orientation of
assembly.
•
Thread the two hose
clamps and align them in
the back two cutouts of the
SF791 mounting channel as
shown. Secure the
mounting channel and hose
clamps by installing the
screws shown.
•
Mounting hardware:
•
5X – B041270
SF973-INST
≈
1.5”
≈
9”