•
Mount SF749 in the upmost
position on SF750 using the
four spring plungers on
SF749.
•
Route remaining length of
sonar cable as shown.
•
Plug the 12-pin end of the
sonar cable into the 12-pin
receptacle shown.
•
Note:
The sonar cable
should be routed such that
manual lift operation does
not damage the cable.
•
Plug the other end of the
EC1154 cable into the Mud
Master transmission.
22
SF973-INST