
5
mounted switch.
3.
Circuit Overloading
- Be sure that the supply circuit to the rack assembly is
not overload after installing this switch.
4.
Grounding
- Rack-mounted equipment should be properly and well grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.
[Attach Rack-Mount Brackets to the Switch]
1. Position a Rack-Mount Bracket on one side of the Switch.
2. Line up the screw holes on the bracket with the screw holes on the side of the
switch.
3. Use a screwdriver to install the M3 flat head screws through the mounting
bracket holes into the switch. (There could have two or four screws for one
bracket. That depends on the model that installed.)
4. Repeat Step 1~3 to install another bracket to the switch.
5. Now it is ready to mount to a rack.
[Mount the Switch on a Rack]
Summary of Contents for GSW-3208M1
Page 1: ...1 GSW 3208M1 3216M1 3424M1 L2 Managed GbE Switches ...
Page 176: ...173 ...
Page 185: ...182 ...
Page 213: ...210 This page provides an overview of RMON Event table entries ...
Page 215: ...212 This page provides an overview for LACP statistics for all ports ...
Page 227: ...224 6 4 29 Monitor sFlow This page shows receiver and per port sFlow statistics ...
Page 240: ......