
85
CTC EcoZenith i550 Pro
For the installer
Zinc-grey screw (4 off)
Plastic top
Fit the plastic top at the front and tip it backwards to locate it under the
mixing valve actuator. Fit the 4 zinc-grey screws provided in the pre-drilled
holes. Ensure that the plastic top cover is correctly aligned with the front.
Graphite screw (25 off)
Tie strap
When the rear insulation is in place, tension bands can be used to hold it
firmly against the tank. Attach the insulation sections to each other using the
25 graphite-grey screws provided. The screw positions have been pre-drilled.
!
The tension bands
can scratch the
surface of the insu-
lation. Use a piece
of cardboard or
similar to protect it.
Summary of Contents for EcoZenith i550 Pro
Page 1: ...162 105 20 1 2013 06 13 Installation and Maintenance Manual CTC EcoZenith i550 Pro...
Page 95: ...97 CTC EcoZenith i550 Pro For the installer...
Page 97: ...99 CTC EcoZenith i550 Pro For the installer 6725 7 1 6 1 287 322 7 36 1 7 5 1 1 D E...
Page 120: ...122 CTC EcoZenith i550 Pro For the installer 20 Wiring diagram main card 3x400V...
Page 121: ...123 CTC EcoZenith i550 Pro For the installer...
Page 122: ...124 CTC EcoZenith i550 Pro For the installer 21 Wiring diagram main card 1x230V...
Page 123: ...125 CTC EcoZenith i550 Pro For the installer...
Page 124: ...126 CTC EcoZenith i550 Pro For the installer 22 Wiring diagram for expansion card...