
7
CTC EcoZenith i550 Pro
General Information
Important to remember!
Check the following points in particular at the time of delivery and installation:
• The CTC EcoZenith i550 Pro must be transported and stored in
an upright position. When moving the product, it can be placed
temporarily on its back.
• Remove the packaging and check before installation that the product
has not been damaged in transit. Report any transport damage to the
carrier.
• Place the CTC EcoZenith i550 Pro on a solid foundation, preferably
made of concrete. If the product needs to be placed on a soft carpet,
base plates must be placed under the adjustable feet.
• Remember to leave a service area of at least 1 m in front of the
product. Space is also needed around the product for installation of
insulation and plastic top cover. See the chapter on Transportation,
unpacking and installation in the section for the installer. The CTC
EcoZenith i550 Pro must not be lowered beneath floor level.
• Check for missing parts.
• The product must not be installed where the ambient temperature is
higher than 60°C.
Safety Instructions
The following safety instructions must be observed when handling, installing
and using the heat pump:
• All installation must be carried out by a qualified person in accordance
with applicable regulations.
• The product is only intended for vertical installation.
• Close the safety switch before doing any work on the product.
• Do not soak the product with water or any other liquid.
• When handling the product with a hoist ring or similar device, make
sure that the lifting equipment, eyebolts etc. are not damaged. Never
stand under the hoisted product.
• Never jeopardize safety by removing bolted covers, hoods or similar.
• Never jeopardize safety by deactivating safety equipment.
• Any work on the product should be done by authorised personnel only.
• Safety valve check:
– The safety valve for the boiler/system and hot tap water must be
checked on a regular basis. See the chapter on Operation and
maintenance.
Summary of Contents for EcoZenith i550 Pro
Page 1: ...162 105 20 1 2013 06 13 Installation and Maintenance Manual CTC EcoZenith i550 Pro...
Page 95: ...97 CTC EcoZenith i550 Pro For the installer...
Page 97: ...99 CTC EcoZenith i550 Pro For the installer 6725 7 1 6 1 287 322 7 36 1 7 5 1 1 D E...
Page 120: ...122 CTC EcoZenith i550 Pro For the installer 20 Wiring diagram main card 3x400V...
Page 121: ...123 CTC EcoZenith i550 Pro For the installer...
Page 122: ...124 CTC EcoZenith i550 Pro For the installer 21 Wiring diagram main card 1x230V...
Page 123: ...125 CTC EcoZenith i550 Pro For the installer...
Page 124: ...126 CTC EcoZenith i550 Pro For the installer 22 Wiring diagram for expansion card...