background image

 

                                                                                                                

                       

 

            

SIGNATURE  2  SERIES                                                                                        

Valve Body Drive Assy. 

14

2

9

22

1

3

4

8

10

11

12

14

15

13

16

17

18

19

20

24

21

23

6

5

7

6A

Ref 

#

Description

Part #

Qty.

1

Piston Assembly

20001X231

1

2

10-24 x 13/16 Screw

20001X226

3

3

Seal & Spacer Kit

20561X253

1

4

End Spacer

N/S

1

5

Flow Control Button 1.5 GPM

20251X266

1

Flow Control Button 2.0 GPM

20251X267

1

Flow Control Button 2.4 GPM

20251X268

1

Flow Control Button 3.0 GPM

20251X269

1

Flow Control Button 3.5 GPM

20251X270

1

Flow Control Button 4.0 GPM

20251X271

1

Flow Control Button 5.0 GPM

20251X272

1

Flow Control Button 7.0 GPM

20251X274

1

6

Plastic Flow Control Housing

20251X100

1

6a

Flow Control Assembly – Specify GPM Incl. (1) each 
#20 thru #23
Flow Control Assy. 1.5 GPM-
PVC

20251X256

1

Flow Control Assy. 2.0 GPM-
PVC

20251X257

1

Flow Control Assy. 2.4 GPM-
PVC

20251X258

Flow Control Assy. 3.0 GPM-
PVC

20251X259

1

Flow Control Assy. 3.5 GPM-
PVC

20251X260

1

Flow Control Assy. 5.0 GPM-
PVC

20251X262

1

Flow Control Assy. 7.0 GPM-
PVC

20251X264

1

7

Drain Line Fitting 90º Elbow
1/2” NPT X 1/2” Tubing

20251X255

1

8

Drain Retainer

20001X214

1

9

Brine Assembly

20561X225

1

10

BLFC Assembly .5 GPM

20001X228

1

 

Ref 

#

Description

Part #

Qty.

11

Brine Line Ferrule

20251X305

1

12

Brine Line Compression Nut

N/S

1

13

10-24 X 1 Hex Screw

20001X226

1

14

Injector Cap

20001X223

1

14a Injectory Kit-Specify Size- Inc. 

(1) ea #14, #15, #16, #17 & 
(2) #13

20001X220

1

15

Injector Seal

20001X224

1

16

Injector Assy. Specify Size

20001X219

1

17

Injector Screen

20001X222

1

18

Injector Plug & O-Ring Assy.

20001X217

1

19

O-Ring

2000X215

1

20

O-Ring

20561X204

1

Items #21 thru #24 used ONLY with clock regeneration

21

Mounting Clip

20561X201

2

22

8-18 X 5/8” Screw

20561X217

2

23

Adapter Coupling

N/S

2

23a Adapter Coupling & O Ring 

Assy. Incl. (1) #40 & (2) # 41

20561X215

1

24

O-Ring

20561X216

4

Summary of Contents for greensand plus IF10-S2

Page 1: ...SIGNATURE 2 SERIES Greensand Plus Iron Filter Manual Installation Operation Manual...

Page 2: ...tion Page 3 Control Start Up Procedures Page 8 Utilizing Bluetooth Page 11 Master Programming Page 12 Powerhead Assembly Page 13 Valve Body Assembly Page 14 Bypass Assembly Page 15 Additional Informat...

Page 3: ...als It is recommended that Teflon tape be used to seal plastic Noryl threaded fittings 2 General Specifications IF10 S2 IF15 S2 IF20 S2 IF25 S2 Filter Media Greensand Plus Filter Media Capacity cu ft...

Page 4: ...ed service The valve then reverses the flow of the water through the filter bed to produce a backwash to the drain Because of the density of the media bed it is very important to size the filter to th...

Page 5: ...o a water heater to prevent damage due to back up of hot water DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur See Typical Installation Diagram CITY WATE...

Page 6: ...ntrol valve by unscrewing from the tank b Remove and inspect distributor tube and bottom basket c Replace distributor tube and use a cork or tape to place over top of distributor tube to prevent miner...

Page 7: ...emove rubber band from float valve 3 Measure distance from bottom of chemical feed valve to the bottom of float with the float in the UP position To move float slide rubber grommets up and down float...

Page 8: ...ines turn off faucet Initial Control Valve Operation 1 Advance control valve to BACKWASH cycle 1 position and allow water to run to drain for 3 to 4 minutes Warning Close handle on bypass prior to sel...

Page 9: ...ever occur 3 Default setting is 6 days for filters 5 To Exit Main Menu press the Menu Enter button Note If no buttons are pressed for 60 seconds the Main Menu will be exited automatically 8 Control St...

Page 10: ...during this time To confirm that the battery is working press either button and the display will turn on for five 5 seconds If power failure occurs while system is regenerating the Isobar 2 will motor...

Page 11: ...step With Days Remaining Until Next Regeneration at 1 Press and hold the Set Change button After 3 seconds the backwash cycle will begin 3 To Fast Cycle thru regeneration First complete above 2 steps...

Page 12: ...and 2 this device must accept any interference received including interference that may cause undesired operation Changes or modifications not expressly approved by the party responsible for complian...

Page 13: ...ge the digits with the Set Change button and accept with the Menu Enter button After the entire display flashes press the Menu Enter button to move to the next menu item 2 Regeneration Cycle Step Time...

Page 14: ...ad Assy 21003X100 1 1 Softener Circuit Boad Assy 21001X102 1 2 Encoder 20001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 20001X120 1 6 Power Supply 20001X125 1 7 Back Plate...

Page 15: ...4 GPM PVC 20251X258 Flow Control Assy 3 0 GPM PVC 20251X259 1 Flow Control Assy 3 5 GPM PVC 20251X260 1 Flow Control Assy 5 0 GPM PVC 20251X262 1 Flow Control Assy 7 0 GPM PVC 20251X264 1 7 Drain Lin...

Page 16: ...SIGNATURE 2 SERIES Bypass Assembly Ref Description Part Qty 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless Steel 20561X283 1 15 1 2...

Page 17: ...p 3 Remove injector assembly Apply silicone lubricant to new injector assembly O rings and install Be sure to push injector assembly tightly so O rings are seated Install a new screen 4 Apply silicone...

Page 18: ...lve manually to assure proper function Make sure control valve is returned to the service position 13 Make sure there is enough salt in the brine tank 14 Start regeneration cycle manually if water is...

Page 19: ...the outer edge of each seal to make sure it is seated When all seals and spacers are seated properly you will have a 1 4 of space between the top seal the the top of the valve body 6 Follow Steps E7...

Page 20: ...water is over it Resin fouling Call dealer Find out how to confirm it Clean the resin and prevent future fouling Poor distribution channeling uneven bed surface Call dealer Check backwash flow Regene...

Page 21: ...connectionsfor air leaks Internal control leak Call dealer Check piston seals and spacers for scratches and dents 9 Continuous Flow to Drain Foreign material in control piston and seals Call dealer C...

Page 22: ...SIGNATURE 2 SERIES...

Page 23: ...SIGNATURE 2 SERIES Notes...

Page 24: ...SIGNATURE 2 SERIES 710 Orange Street Ashland OH 44805 PH 419 289 1500 FAX 419 289 1515 www watersoftinc com...

Reviews: