background image

 

 

SIGNATURE 2 SERIES          

 

                                                                                                                

                       

 

            

SIGNATURE  2  SERIES                                                                                        

Normal Operation

1. 

Home Display

 

a. Alternates between the display of Time of Day and Number of Days until the Next 

 

    Backwash. (Metered Softeners will alternate between time of days and gallons 

 

    remaining until next regeneration)

 

 

- Days Remaining until the Next Backwash will count down from the entered 

 

  

  value until it reaches 1 day remaining.

 

 

- A Backwash Cycle will then be initiated at the next designated regeneration  

 

 

 

  time.

 
2. 

Battery Back-Up

 (Uses a standard 9-volt alkaline battery.)

  

 

 

Features of Battery Back-Up:

 

 

• During power failures, the battery will maintain the time of day as long as the 

 

 

  battery has power. The display is turned off to conserve battery power during 

 

 

  this time. To confirm that the battery is working, press either button and the 

 

 

  display will turn on for five (5) seconds.

 

 

• If power failure occurs while system is regenerating, the Isobar 2   

 

       

  

 

   will motor to a shut off position to prevent constant flow to drain. Depending                      

 

 

  upon system pressure and other factors, it is possible to observe a reduced flow to  

 

 

  drain during this step. After power is restored, the Isobar 2 will return  

 

 

              

  and finish the cycle where it left off prior to the power interruption.

   
 

 

• When used without battery back-up, during a power failure, the unit stops at its   

 

     

  current point in the regeneration position and then restarts at that point when the  

 

 

  power is restored. The time will be offset by the increment of time the unit was

    

   

 

without power, so it is necessary to reset the time of day on the unit. No other

 

 

  system will be affected.

    
             
        

    

 

Control Start-Up Procedures

  9

Summary of Contents for greensand plus IF10-S2

Page 1: ...SIGNATURE 2 SERIES Greensand Plus Iron Filter Manual Installation Operation Manual...

Page 2: ...tion Page 3 Control Start Up Procedures Page 8 Utilizing Bluetooth Page 11 Master Programming Page 12 Powerhead Assembly Page 13 Valve Body Assembly Page 14 Bypass Assembly Page 15 Additional Informat...

Page 3: ...als It is recommended that Teflon tape be used to seal plastic Noryl threaded fittings 2 General Specifications IF10 S2 IF15 S2 IF20 S2 IF25 S2 Filter Media Greensand Plus Filter Media Capacity cu ft...

Page 4: ...ed service The valve then reverses the flow of the water through the filter bed to produce a backwash to the drain Because of the density of the media bed it is very important to size the filter to th...

Page 5: ...o a water heater to prevent damage due to back up of hot water DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur See Typical Installation Diagram CITY WATE...

Page 6: ...ntrol valve by unscrewing from the tank b Remove and inspect distributor tube and bottom basket c Replace distributor tube and use a cork or tape to place over top of distributor tube to prevent miner...

Page 7: ...emove rubber band from float valve 3 Measure distance from bottom of chemical feed valve to the bottom of float with the float in the UP position To move float slide rubber grommets up and down float...

Page 8: ...ines turn off faucet Initial Control Valve Operation 1 Advance control valve to BACKWASH cycle 1 position and allow water to run to drain for 3 to 4 minutes Warning Close handle on bypass prior to sel...

Page 9: ...ever occur 3 Default setting is 6 days for filters 5 To Exit Main Menu press the Menu Enter button Note If no buttons are pressed for 60 seconds the Main Menu will be exited automatically 8 Control St...

Page 10: ...during this time To confirm that the battery is working press either button and the display will turn on for five 5 seconds If power failure occurs while system is regenerating the Isobar 2 will motor...

Page 11: ...step With Days Remaining Until Next Regeneration at 1 Press and hold the Set Change button After 3 seconds the backwash cycle will begin 3 To Fast Cycle thru regeneration First complete above 2 steps...

Page 12: ...and 2 this device must accept any interference received including interference that may cause undesired operation Changes or modifications not expressly approved by the party responsible for complian...

Page 13: ...ge the digits with the Set Change button and accept with the Menu Enter button After the entire display flashes press the Menu Enter button to move to the next menu item 2 Regeneration Cycle Step Time...

Page 14: ...ad Assy 21003X100 1 1 Softener Circuit Boad Assy 21001X102 1 2 Encoder 20001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 20001X120 1 6 Power Supply 20001X125 1 7 Back Plate...

Page 15: ...4 GPM PVC 20251X258 Flow Control Assy 3 0 GPM PVC 20251X259 1 Flow Control Assy 3 5 GPM PVC 20251X260 1 Flow Control Assy 5 0 GPM PVC 20251X262 1 Flow Control Assy 7 0 GPM PVC 20251X264 1 7 Drain Lin...

Page 16: ...SIGNATURE 2 SERIES Bypass Assembly Ref Description Part Qty 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless Steel 20561X283 1 15 1 2...

Page 17: ...p 3 Remove injector assembly Apply silicone lubricant to new injector assembly O rings and install Be sure to push injector assembly tightly so O rings are seated Install a new screen 4 Apply silicone...

Page 18: ...lve manually to assure proper function Make sure control valve is returned to the service position 13 Make sure there is enough salt in the brine tank 14 Start regeneration cycle manually if water is...

Page 19: ...the outer edge of each seal to make sure it is seated When all seals and spacers are seated properly you will have a 1 4 of space between the top seal the the top of the valve body 6 Follow Steps E7...

Page 20: ...water is over it Resin fouling Call dealer Find out how to confirm it Clean the resin and prevent future fouling Poor distribution channeling uneven bed surface Call dealer Check backwash flow Regene...

Page 21: ...connectionsfor air leaks Internal control leak Call dealer Check piston seals and spacers for scratches and dents 9 Continuous Flow to Drain Foreign material in control piston and seals Call dealer C...

Page 22: ...SIGNATURE 2 SERIES...

Page 23: ...SIGNATURE 2 SERIES Notes...

Page 24: ...SIGNATURE 2 SERIES 710 Orange Street Ashland OH 44805 PH 419 289 1500 FAX 419 289 1515 www watersoftinc com...

Reviews: