3
1: Select a counter location for your Draft Tower and an undercounter location for the CP2000 Chiller
making sure they are within
6’
of each other (unit requires ventilation inside space it is being
placed and clearance around it). Place the CP2000 unit within
6”
of the water filter connection,
floor sink & dedicated 120
-
volt electrical outlet (non
-
GFI preferred).
2: Locate the CR
-
KIT
-
CPUC Install Fitting Kit, the CR
-
14FC Water filter system, the CBR draft tower,
RDP drain pan and CR
-
3741 CO2 regulator. Take care to not lose or misplace any of the fittings
from the kits. When opening the box for the CBR draft tower, note that the Faucets, faucet
handles, faucet wrench and several fittings specifically for the draft tower ship loose with tower.
See Page 5 for Install kit items and page 7 for draft tower kit.
3: Prepare the counter for mounting the drain pan and draft tower per the cutout and hole dimesons
of the models used. Set the drain pan in place and silicone seal it to the counter. Mount the tower
and secure the superseal fitting to the product tubes on the tower.
See pages 5, 6 & 7 for fitting info, drain pan cut out and mounting the tower.
4: Locate the
6’
of CR
-
4L14 insulated trunkline supplied with the CR
-
KIT
-
CPUC Install kit and prep
both ends by trimming the tubes and adding the appropriate fittings for connections to the chiller
and tower. See pages 8 for tower side and 13 for chiller side trunkline prep.
5: Connect the tower and chiller. Both of these connection ends should be wrapped with the insulated
foam tape completely covering all exposed hoses and fittings, to prevent sweating and heat loss
and damage to the fittings. See pages 8 and 13 for connection info.
6: Apply the fittings to the Water Filter System, and mount it vertically in an accessible location.
Locate and attached the 50 psi water pressure reducing valve on the outlet side plumbing of the
filter system. See page 11 for filter system detail.
7: Unwrap the hoses and electrical cord coming out of the chiller. Make water inlet and CO2 inlet
connections. Route over flow drain to floor sink. Run Electrical cord to plug. See pages 12 and 14.
8: Fill the Water Bath: Remove lid and fill water bath with non
-
filtered tap water, fill up no less than
¼
”
to top of white standpipe or until the water coil is completely covered. This is the vertical white
tube in the water bath that is connected to the clear overflow hose.
9: Turn on the Water. Check connections for leaks and flush the water filters.
10: Open CO2 by turning knob on tank. Adjust regulator to 75 PSI. And check for leaks.
11: Wrap all the exposed fittings, product lines and recirculation lines the chiller side and tower side
with the insulated tape provided. This will insulate them to stay cold and prevent condensation on
the lines.
12: Plug unit power cord into 120
-
volt outlet. Toggle the ON/OFF rocker switch to the ON position.
Fan and compressor will turn on. Fan and compressor will automatically turn off when a complete
ice bank is made and cycle on and off to maintain it.
13: Unit will take between 3 & 4 hours to make a complete ice bank.
14: Pull open the still water and sparkling water faucets to run water through the system. You will
need to run the sparkling water faucet for several minutes to cycle the carbonation system before
full sparkling water will dispense.
15: Once unit has built the ice bank check the carbonation of sparkling water and adjust flow rate via
the faucet. You are now ready to dispense chilled still and sparkling water.
CP2000
-
R
-
UC
-
BH Undercounter Chilled Sparkling & Still Water Dispenser
Installation Guide Overview Instructions