background image

 16

 

CP2000

-

R

-

UC

-

BH & CBR Tower Cleaning and Maintenance Recommendations

.

 

Daily: 

 

Wipe down the unit or draft tower, cleaning and drying all surfaces.                                                                       

(

Use

 window cleaner on mirrored and chrome finishes). 

 

Clean and dry drain pan and drain grate. Check that water is draining, pour warm water down drain if 

necessary.    

 

Check over faucets for action and hand tighten any loosened handles or nuts on them to prevent 

leaks. The set nut holding the handle down will loosen with use. As can the shank nut. 

 

Check flow from faucet, loosen, readjust and tighten flow control knob as needed.  

 

Check that flow, temperature and carbonation of water poured from the unit are consistent to                

average use. 

 

Weekly: 

 

Clean the faucets by wiping them down. If there is any scale or slime submerge them in cleaners/

sanitizer and use a brush on them. Check the faucets over for leaks and tighten part to stop the 
leak. Reference the SSQ Tech Guide document for more details on maintaining the faucets. 

 

Check CO2 level at CO2 tank.   

 

Monthly: 

 

Check for good water pressure at the water filter system by running water from flush valve on filter. 

 

Visually check pre

-

filter in clear bowl on water filter system (if applicable) to determine if it 

needs replacing. Use only EPC5

-

10 replacement pre

-

filter cartridge.  

 

Quarterly: 

 

Check the water bath level, either top off or drain, clean and refill.

 

Semiannually: 

 

Change the water filters. Use only 4FC replacement filter cartridges. 

 

Drain water bath, clean and refill with new water and add a cap full of sanitizer. 

 

Remove and disassemble faucets for cleaning and inspection. 

 

Annually: 

 

Inspect internal water bath components such as Agitator/re

-

circ pump and blade, check valves for 

CO2 and Water, and all hose connections.  

 

Flush and rinse system with food safe sanitizer (this work should be performed by a certified service 

tech). 

 

Model Number:________________     Serial Number: ___________________

 

Install Date: _____________   Installer/Servicer: ________________________

 

Crysalli 1739 Sabre St. Hayward, CA 94545. 510

-

732

-

0100. www.crysalli.com

 

Summary of Contents for CP2000-R-UC-BH

Page 1: ...1 CP2000 R UC BH Installation Guide Sparkling Still Chilled Undercounter System CP2000 R UC BH undercounter chiller With CBR or LIT Series Draft tower REV_1018 www Crysalli com ...

Page 2: ...andles are screwed down tight front facing and on the appropriate faucet Sparkling water cold carbonated and tastes clean and pure Run a few liters of water is carb pump cycling on and flow consistent without gassing out Still Water cold and consistent flow Tastes clean and pure Flow adjustment on faucets set and knob tightened down so flow rate appropriate and locked in Connections to tower made ...

Page 3: ...ings to the Water Filter System and mount it vertically in an accessible location Locate and attached the 50 psi water pressure reducing valve on the outlet side plumbing of the filter system See page 11 for filter system detail 7 Unwrap the hoses and electrical cord coming out of the chiller Make water inlet and CO2 inlet connections Route over flow drain to floor sink Run Electrical cord to plug...

Page 4: ... Chilled Water and Carb Water lines to the bulk head connections on chiller Connect the U bend JG fitting at the tower end of the trunkline to loop the red recirc lines And connect these lines to Recirc bulk head fittings at the chiller ...

Page 5: ... after the water filter to regulate pressure feeding unit to 50 1 12 section of 3 8 OD Tube PE 12 EI 12 Hose for Water Filter and Inlet connections 15 JG 3 8 Locking Clips PIC1812R Collet locking clip for 3 8 JG fittings 4 JG 1 4 Locking Clips PIC1808R Collet locking clip for 1 4 JG fittings 1 15 Role of Armaflex tape insulation tape to wrap product and re circ lines and tower 4 15 Zip Ties For se...

Page 6: ...1 8 Overall 2 Tower Hole on pan 10 3 8 x 8 1 2 Drain Pan 1 2 Dia Copper Drain Stub CBR V1 1 3 8 Hole CBR V2 1 1 2 Hole CBR V3 1 7 8 Hole LIT V2C 2 Hole LIT V3C 2 Hole RDP 3SSQ for use with CBR V3C W Tower LIT V3C Tower Specs 15 x 18 1 8 Overall 2 Tower Hole on pan 13 3 8 x 10 1 2 Drain Pan 1 2 Dia Copper Drain Stub 2 Threaded stud for mounting 10 24 Thread with Locking Nut and 3 x1 SS Mounting Str...

Page 7: ...w fittings to connect the Product line from the trunkline to the tower It is easiest to attach these fittings to the product tubes of the trunkline first using the red locking clips then connect them to the Superseal fittings on the tower tubes see CR 4L38 Trunkline Tower End Connections page SI030812S Superseal Elbow loosen collet nut push into SS tube and tighten collet nut Step 2 Step 1 Locate ...

Page 8: ...ose from the filter to the 3rd tube for ambient water After testing the system for leaks wrap all exposed hoses and fittings with the Insulated tap found in the UCM install kit Step 3 Step 1 Locate the CR 4L14 Trunkline 6 will be included with the CPUC install kit And Prep both ends for connection to the Chiller and Draft tower This trunkline typically doesn t need to be cut shorter the extra leng...

Page 9: ...ack to lock in Pull shank nut to faucet and hand tighten Tighten shank nut with Faucet Wrench Locate the Faucet Bodies Handles and Faucet Wrench The faucet bodies attach to the shanks that are pre attached to the tower and leak tested When attaching the faucet body to the shank be sure the faucet is properly aligned before tightening it down Adjusting the faucet angle when attached to the shank ca...

Page 10: ...Q1231 Faucets used on the CBR V1 CBR V2 CBR V3 LIT V2C and LIT V3C dispensing towers will need the flow rate adjusted and set To set the flow rate lock the flow adjustment knob make sure system is on and cold and CO2 open Locate the black plastic three pronged adjustment knob on the right side of the faucet and check that you can freely turn it you may need to loosen the Phillips head set screw a ...

Page 11: ...ack PE 12 EI Tubing Cut this to the appropriate length for inlet and outlet needs Your install kit may have some 1 4 braided hose in it That hose is for the CO2 only Do Not use the braided hose on JG fittings NOTE Always reference local plumbing codes for the use requirement of a back flow preventer as well as type and location within the system Locate the 183 150 NF 50 PSI Water Pressure Reducing...

Page 12: ...e it should be routed to a floor sink if accessible and positioned per plumbing code Place the unit in the cabinet space with at least 4 of space behind it for clearance for the trunkline bundle connections and chiller vents louvers on the side panels Do not block any of the ventilated panels on the chiller Install CR TFB1 Fan Box in cabinet at this time if using one Locate bundled Electrical cord...

Page 13: ...CP2000 R UC BH has four bulk head outlet connections to attach the trunkline too Two horizontal 3 8 connections for the red striped re circ lines and two 1 4 vertical connections for the Product water lines Still Chilled water is marked PLAIN WATER Sparkling Water is marked CARB WATER With your trunkline prepared with the elbow fittings attached as described above you can now attach it to the chil...

Page 14: ...1SN Secondary High Pressure CO2 Regulator to regulate Flare Nut with Nylon Washer in it CR 3741 Route the Clear Over Flow Water Bath Drain hose from the back of the unit to a floor sink or floor drain The Water Bath must be filled with water for the system to work and build an Ice Bank This water is not used for consumption it is only used to form an Ice Bank around the refrigeration coils and chi...

Page 15: ...dling instructions from the CO2 tank supplier CR 3741 High Pressure CO2 Regulator 0 160 PSI Attaches to 5 100 lb CO2 tanks Set to 75 PSI Note Low Pressure Beer Regulators 0 50 psi will not work properly with Crysalli Common CO2 Tank Cylinder sizes in Commercial use Use with Primary High Pressure Reg CR 3741 Common Bulk CO2 Tanks Use with Secondary High Pressure Reg CR T5261SN 27 5 8 8 47 Output Pr...

Page 16: ...ment for more details on maintaining the faucets Check CO2 level at CO2 tank Monthly Check for good water pressure at the water filter system by running water from flush valve on filter Visually check pre filter in clear bowl on water filter system if applicable to determine if it needs replacing Use only EPC5 10 replacement pre filter cartridge Quarterly Check the water bath level either top off ...

Reviews: