4
Connect JG Fittings to tower and
“
Chilled Water
”
and
“
Carb Water
”
lines to the bulk head connections
on chiller.
Connect the U bend JG fitting at
the tower end of the trunkline to
loop the red recirc lines. And
connect these lines to
‘
Recirc
”
bulk
head fittings at the chiller.